Boeing Delivers its Last 747 Jumbo Jet

Peter Lobner

On 30 September 1968, the first Boeing 747 was rolled out at the company’s plant in Everett, WA. The first flight took place on 9 February 1969, and the FAA certified the 747 in December of that year. Pan Am was the first airline to offer Boeing 747 service on 22 January 1970, flying from New York to London.

1st Boeing 747 rolled out on 30 September 1968. Source: Everett Herald

After a 54-year production run, the last 747, a 747-8 freighter, was rolled out of the factory on Tuesday, 6 December 2022.  Boeing built a total of 1,574 747s in a range of models for commercial and military customers.

Boeing’s last 747 rolled off the assembly line. Source: Paul Weatherman/Boeing

You can watch a short video (1.18 min) of the final rollout here: https://www.youtube.com/watch?v=aBc-CIjLIbA

Boeing delivered its last 747 on 31 January 2023 to Atlas Air.  Here’s the story:  https://www.military.com/daily-news/2023/01/31/boeing-bids-farewell-icon-delivers-last-747-jumbo-jet.html

The final Boeing 747 at a ceremony for delivery to Atlas Air on 31 Jan 2023. Source: AP Photo/John Froschauer

For more Boeing 747 history, check out these articles: