Festo’s SmartBird and BionicSwift – A Decade of Progress in Deciphering How Birds Fly

Peter Lobner

1. Background on Festo

Festo is a German multinational industrial control and automation company based in Esslingen am Neckar, near Stuttgart. The Festo website is here: https://www.festo.com/group/en/cms/10054.htm

Festo reports that they invest about 8% of their revenues in research and development.  Festo’s draws inspiration for some of its control and automation technology products from the natural world. To help facilitate this, Festo established the Bionic Learning Network, which is a research network linking Festo to universities, institutes, development companies and private inventors.  A key goal of this network is to learn from nature and develop “new insights for technology and industrial applications”…. “in various fields, from safe automation and intelligent mechatronic solutions up to new drive and handling technologies, energy efficiency and lightweight construction.”

One of the challenges taken on by the Bionic Learning Network was to decipher how birds fly and then develop robotic devices that can implement that knowledge and fly like a bird. Their first product was the 2011 SmartBird and their newest product is the 2020 BionicSwift.  In this article we’ll take a look at these two bionic birds and the significant advancements that Festo has made in just nine years.

2. SmartBird

On 24 March 2011, Festo issued a press release introducing their SmartBird flying bionic robot, which was one of their 2011 Bionic Learning Network projects. Festo reported:

  • “The research team from the family enterprise Festo has now, in 2011, succeeded in unraveling the mystery of bird flight. The key to its understanding is a unique movement that distinguishes SmartBird from all previous mechanical flapping wing constructions and allows the ultra-lightweight, powerful flight model to take off, fly and land autonomously.”
  • “SmartBird flies, glides and sails through the air just like its natural model – the Herring Gull – with no additional drive mechanism. Its wings not only beat up and down, but also twist at specific angles. This is made possible by an active articulated torsional drive unit, which in combination with a complex control system makes for unprecedented efficiency in flight operation. Festo has thus succeeded for the first time in attaining an energy-efficient technical adaptation of this model from nature.”

SmartBird measures 1.07 meters (42 in) long with a wingspan of 2.0 meters (79 in) and a weigh of 450 grams (16 ounces, 1 pound).  This is about a 1.6X scale-up in the length and span of an actual Herring Gull, but at about one-third the weight. It is capable of autonomous takeoff, flight, and landing using just its wings, and it controls itself the same way birds do, by twisting its body, wings, and tail.  SmartBird’s propulsion system has a power requirement of 23 watts.

Source:  All three SmartBird photos from Festo

More information on SmartBird is on the Festo website here:  https://www.festo.com/group/en/cms/10238.htm

You can watch a 2011 Festo video, “Festo – SmartBird,” (1:47 minutes) on YouTube here:  https://www.youtube.com/watch?v=nnR8fDW3Ilo

3. Bionic Swift

On 1 July 2020, Festo introduced the BionicSwift as their latest ultra light flying bionic robot that mimics how actual birds fly. 

The BionicSwift, inspired by a Common Swift, measures 44.5 cm (17.5 in) long with a wingspan of 68 cm (26.7 in) and a weight of just 42 grams (1.5 ounces). It’s approximately a 2X scale-up of a Common Swift, but still a remarkably compact, yet complex flying machine with aerodynamic plumage that closely replicates the flight feathers on an actual Swift.  The 2011 SmartBird was more than twice the physical size and ten times heavier.

The BionicSwift is agile, nimble and can even fly loops and tight turns.  Festo reports: “Due to this close-to-nature replica of the wings, the BionicSwifts have a better flight profile than previous wing-beating drives.”  Compare the complex, feathered wing structure in the following Festo photos of the BionicSwift with the previous photos showing the simpler, solid wing structure of the 2011 SmartBird.

Source:  All three BionicSwift photos from Festo

A BionicSwift can fly singly or in coordinated flight with a group of other BionicSwifts.  Festo describes how this works: “Radio-based indoor GPS with ultra wideband technology (UWB) enables the coordinated and safe flying of the BionicSwifts. For this purpose, several radio modules are installed in one room. These anchors then locate each other and define the controlled airspace. Each robotic bird is also equipped with a radio marker. This sends signals to the anchors, which can then locate the exact position of the bird and send the collected data to a central master computer, which acts as a navigation system.”  Flying time is about seven minutes per battery charge.

More information on the Bionic Swift is on the Festo website here:  https://www.festo.com/group/en/cms/13787.htm

You also can watch a 2020 Festo video, “Festo – BionicSwift,” (1:45 minutes) on YouTube here: https://www.youtube.com/watch?v=v8fgc77dwwg

4. For more information about other Festo bionic creations: 

I encourage you to visit the Festo BionIc Learning Network webpage at the following link and browse the resources available for the many intriguing projects. https://www.festo.com/group/en/cms/10156.htm

On this webpage you’ll find a series of links listed under the heading  “More Projects,” which will introduce you to the wide range of Bionic Learning Network projects since 2006.

You also can watch the following YouTube short videos of Festo’s many bionic creations:

Post-World War II Prefabricated Aluminum and Steel Houses and Their Relevance Today

Peter Lobner

1. Background

At the start of World War II (WW II), US home ownership had dropped to a low of 43.6% in 1940, largely as a consequence of the Great Depression and the weak US economy in its aftermath.  During WW II, the War Production Board issued Conservation Order L-41 on 9 April 1942, placing all construction under rigid control. The order made it necessary for builders to obtain authorization from the War Production Board to begin construction costing more than certain thresholds during any continuous 12-month period.  For residential construction, that limit was $500, with higher limits for business and agricultural construction.  The impact of these factors on US residential construction between 1921 and 1945 is evident in the following chart, which shows the steep decline during the Great Depression and again after Order L-41 was issued. 

Source:  “Construction in the War Years – 1942 -45,” 
US Department of Labor, Bulletin No. 915

By the end of WW II, the US had an estimated 7.6 million troops overseas.  The War Production Board revoked L-41 on 15 October 1945, five months after V-E (Victory in Europe) day on 8 May 1945 and six weeks after WW II ended when Japan formally surrendered on 2 September 1945.  In the five months since V-E day, about three million soldiers had already returned to the US.  After the war’s end, the US was faced with the impending return of several millions more veterans. Many in this huge group of veterans would be seeking to buy homes in housing markets that were not prepared for their arrival.  Within the short span of a year after Order L-41 was revoked, the monthly volume of private housing expenditures increased fivefold.  This was just the start of the post-war housing boom in the US.

In a March 1946 Popular Science magazine article entitled “Stopgap Housing,” the author, Hartley Howe, noted, “ Even if 1,200,000 permanent homes are now built every year – and the United States has never built even 1,000,000 in a single year – it will be 10 years before the whole nation is properly housed.  Hence, temporary housing is imperative to stop that gap.”  To provide some immediate relief, the Federal government made available many thousands of war surplus steel Quonset huts for temporary civilian housing.

Facing a different challenge in the immediate post-war period, many wartime industries had their contracts cut or cancelled and factory production idled. With the decline of military production, the U.S. aircraft industry sought other opportunities for employing their aluminum, steel and plastics fabrication experience in the post-war economy. 

2. Post-WW II prefab aluminum and steel houses in the US 

In the 2 September 1946 issue of Aviation News magazine, there was an article entitled “Aircraft Industry Will Make Aluminum Houses for Veterans,” that reported the following:

  • “Two and a half dozen aircraft manufacturers are expected soon to participate in the government’s prefabricated housing program.”
  • “Aircraft companies will concentrate on FHA (Federal Housing Administration) approved designs in aluminum and its combination with plywood and insulation, while other companies will build prefabs in steel and other materials.  Designs will be furnished to the manufacturers.”
  • “Nearly all war-surplus aluminum sheet has been used up for roofing and siding in urgent building projects; practically none remains for the prefab program.  Civilian Production Administration has received from FHA specifications for aluminum sheet and other materials to be manufactured, presumably under priorities.  Most aluminum sheet for prefabs will be 12 to 20 gauge – .019 – .051 inch.”

In October 1946, Aviation News magazine reported, “The threatened battle over aluminum for housing, for airplanes and myriad postwar products in 1947 is not taken too seriously by the National Housing Agency, which is negotiating with aircraft companies to build prefabricated aluminum panel homes at an annual rate as high as 500,000.”……”Final approval by NHA engineers of the Lincoln Homes Corp. ‘waffle’ panel (aluminum skins over a honeycomb composite core) is one more step toward the decision by aircraft companies to enter the field.…..Aircraft company output of houses in 1947, if they come near meeting NHA proposals, would be greater than their production of airplanes, now estimated to be less than $1 billion for 1946.”

In late 1946, the FHA Administrator, Wilson Wyatt, suggested that the War Assets Administration (WAA), which was created in January 1946 to dispose of surplus government-owned property and materials, temporarily withhold surplus aircraft factories from lease or sale and give aircraft manufacturers preferred access to surplus wartime factories that could be converted for mass-production of houses.  The WAA agreed.

Under the government program, the prefab house manufacturers would have been protected financially with FHA guarantees to cover 90% of costs, including a promise by Reconstruction Finance Corporation (RFC) to purchase any homes not sold.  

Many aircraft manufacturers held initial discussions with the FHA, including:  Douglas, McDonnell, Martin, Bell, Fairchild, Curtis-Wright, Consolidated-Vultee, North American, Goodyear and Ryan.  Boeing did not enter those discussions and Douglas, McDonnell and Ryan exited early.  In the end, most aircraft manufacturer were unwilling to commit themselves to the postwar prefab housing program, largely because of their concerns about disrupting their existing aircraft factory infrastructure based on uncertain market estimates of size and duration of the prefab housing market and lack of specific contract proposals from the FHA and NHA.

The original business case for the post-war aluminum and steel pre-fabricated houses was that they could be manufactured rapidly in large quantities and sold profitably at a price that was less than conventional wood-constructed homes.  Moreover, the aircraft manufacturing companies restored some of the work volume lost after WW II ended and they were protected against the majority of their financial risk in prefab house manufacturing ventures.

Not surprisingly, building contractors and construction industry unions were against this program to mass-produce prefabricated homes in factories, since this would take business away from the construction industry.  In many cities the unions would not allow their members to install prefabricated materials. Further complicating matters, local building codes and zoning ordnances were not necessarily compatible with the planned large-scale deployment of mass-produced, prefabricated homes.

The optimistic prospects for manufacturing and erecting large numbers of prefabricated aluminum and steel homes in post-WW II USA never materialized.  Rather than manufacturing hundreds of thousands of homes per year, the following five US manufacturers produced a total of less than 2,600 new aluminum and steel prefabricated houses in the decade following WW II:  Beech Aircraft, Lincoln Houses Corp., Consolidated-Vultee, Lustron Corp. and Aluminum Company of America (Alcoa).  In contrast, prefabricators offering more conventional houses produced a total of 37,200 units in 1946 and 37,400 in 1947.  The market demand was there, but not for aluminum and steel prefabricated houses.

US post-WW II prefabricated aluminum and steel houses

These US manufacturers didn’t play a significant part in helping to solve the post-WW II housing shortage.  Nonetheless, these aluminum and steel houses still stand as important examples of affordable houses that, under more favorable circumstances, could be mass-produced even today to help solve the chronic shortages of affordable housing in many urban and suburban areas in the US.  

Some of the US post-WW II housing demand was met with stop gap, temporary housing using re-purposed, surplus wartime steel Quonset huts, military barracks, light-frame temporary family dwelling units, portable shelter units, trailers, and “demountable houses,” which were designed to be disassembled, moved and reassembled wherever needed.  You can read more about post-WW II stop gap housing in the US in Hartley Howe’s March 1946 article in Popular Science (see link below).

The construction industry ramped up rapidly after WW II to help meet the housing demand with conventionally-constructed permanent houses, with many being built in large-scale housing tracts in rapidly expanding suburban areas.  Between 1945 and 1952, the Veterans Administration reported that it had backed nearly 24 million home loans for WW II veterans. These veterans helped boost US home ownership from 43.6% in 1940 to 62% in 1960.

Two post-WW II US prefabricated aluminum and steel houses have been restored and are on public display in the following museums:

In addition, you can visit several WW II Quonset huts at the Seabees Museum and Memorial Park in North Kingstown, Rhode Island.  None are outfitted like a post-WW II civilian apartment.  The museum website is here:  https://www.seabeesmuseum.com

You’ll find more information in my articles on specific US post-WW II prefabricated aluminum and steel houses at the following links:

3. Post-WW II prefab aluminum and steel houses in the UK 

By the end of WW II in Europe (V-E Day is 8 May 1945), the UK faced a severe housing shortage as their military forces returned home to a country that had lost about 450,000 homes to wartime damage.

On 26 March 1944, Winston Churchill made an important speech promising that the UK would manufacture 500,000 prefabricated homes to address the impending housing shortage. Later in the year, the Parliament passed the Housing (Temporary Accommodation) Act, 1944, charging the Ministry of Reconstruction with developing solutions for the impending housing shortage and delivering 300,000 units within 10 years, with a budget of £150 million.  

The Act provided several strategies, including the construction of temporary, prefabricated housing with a planned life of up to 10 years.  The Temporary Housing Program (THP) was officially known as the Emergency Factory Made (EFM) housing program.  Common standards developed by the Ministry of Works (MoW) required that all EFM prefabricated units have certain characteristics, including:

  • Minimum floor space of 635 square feet (59 m2)
  • Maximum width of prefabricated modules of 7.5 feet (2.3 m) to enable transportation by road throughout the country
  • Implement the MoW’s concept of a “service unit,” which placed the kitchen and bathroom back-to-back to simplify routing plumbing and electrical lines and to facilitate factory manufacture of the unit.
  • Factory painted, with “magnolia” (yellow-white) as the primary color and gloss green as the trim color.

In 1944, the UK Ministry of Works held a public display at the Tate Gallery in London of five types of prefabricated temporary houses.

  • The original Portal all-steel prototype bungalow
  • The AIROH (Aircraft Industries Research Organization on Housing) aluminum bungalow, made from surplus aircraft material.
  • The Arcon steel-framed bungalow with asbestos concrete panels.  This deign was adapted from the all-steel Portal prototype.
  • Two timber-framed prefab designs, the Tarran and the Uni-Seco

This popular display was held again in 1945 in London.

Supply chain issues slowed the start of the EFM program.  The all-steel Portal was abandoned in August 1945 due to a steel shortage.  In mid-1946, a wood shortage affected other prefab manufacturers. Both the AIROH and Arcon prefab houses were faced with unexpected manufacturing and construction cost increases, making these temporary bungalows more expensive to build than conventionally constructed wood and brick houses.

Under a Lend-Lease Program announced in February 1945, the US agreed to supply the UK with US-built, wood frame prefabricated bungalows known as the UK 100.  The initial offer was for 30,000 units, which subsequently was reduced to 8,000. This Lend-Lease agreement came to an end in August 1945 as the UK started to ramp up its own production of prefabricated houses. The first US-built UK 100 prefabs arrived in late May/early June 1945.   

The UK’s post-war housing reconstruction program was quite successful, delivering about 1.2 million new houses between 1945 and 1951.  During this reconstruction period, 156,623 temporary prefabricated homes of all types were delivered under the EFM program, which ended in 1949, providing housing for about a half million people. Over 92,800 of these were temporary aluminum and steel bungalows.  The AIROH aluminum bungalow was the most popular EFM model, followed by the Arcon steel frame bungalow and then the wood frame Uni-Seco.  In addition, more than 48,000 permanent aluminum and steel prefabricated houses were built by AW Hawksley and BISF during that period.

In comparison to the very small number of post-war aluminum and steel prefabricated houses built in the US, the post-war production of aluminum and steel prefabs in the UK was very successful. 

UK post-WW II prefabricated aluminum and steel houses

In a 25 June 2018 article in the Manchester Evening News, author Chris Osuh reported that, “It’s thought that between 6 or 7,000 of the post-war prefabs remain in the UK…..”   The Prefab Museum maintains a consolidated interactive map of known post-WW II prefab house locations in the UK at the following link:   https://www.prefabmuseum.uk/content/history/map

Screenshot of the Prefab Museum’s interactive map (not including the prefabs in the Shetlands, which are off the top of this screenshot). 

In the UK, Grade II status means that a structure is nationally important and of special interest.  Only a few post-war temporary prefabs have been granted the status as Grade II listed properties: 

  • In an estate of Phoenix steel frame bungalows built in 1945 on Wake Green Road, Moseley, Birmingham, 16 of 17 homes were granted Grade II status in 1998.
  • Six Uni-Seco wood frame bungalows built in 1945 – 46 in the Excalibur Estate, Lewisham, London were granted Grade II status in 2009.  At that time, Excalibur Estates had the largest number of WW II prefabs in the UK: 187 total, of several types.

Several post-war temporary prefabs are preserved at museums in the UK and are available to visit. 

I think the Prefab Museum is best source for information on UK post-WW II prefabs.   When it was created in March 2014 by Elisabeth Blanchet (author of several books and articles on UK prefabs) and Jane Hearn, the Prefab Museum had its home in a vacant prefab on the Excalibur Estate in south London.   After a fire in October 2014, the physical museum closed but has continued its mission to collect and record memories, photographs and memorabilia, which are presented online via the Prefab Museum’s website at the following link:  https://www.prefabmuseum.uk

You’ll find more information in my articles on specific UK post-WW II prefabricated aluminum and steel houses at the following links:

4.  Post-WW II prefab aluminum and steel houses in France 

At the end of WW II, France, like the UK, had a severe housing shortage due to the great number of houses and apartments damaged or destroyed during the war years, the lack of new construction during that period, and material shortages to support new construction after the war.

To help relieve some of the housing shortage in 1945, the French Reconstruction and Urbanism Minister, Jean  Monnet, purchased the 8,000 UK 100 prefabricated houses that the UK had acquired from the US under a Lend-Lease agreement.  These were erected in the Hauts de France (near Belgium), Normandy and Brittany, where many are still in use today.

The Ministry of Reconstruction and Town Planning established requirements for temporary housing for people displaced by the war.  Among the initial solutions sought were prefabricated dwellings measuring 6 x 6 meters (19.6 x 19.6 feet); later enlarged to 6 × 9 meters (19.6 x 29.5 feet). 

About 154,000 temporary houses (the French called then “baraques”), in many different designs, were erected in France in the post-war years, primarily in the north-west of France from Dunkirk to Saint-Nazaire.  Many were imported from Sweden, Finland, Switzerland, Austria and Canada.

The primary proponent of French domestic prefabricated aluminum and steel house manufacturing was Jean Prouvé, who offered a novel solution for a “demountable house,” which could be easily erected and later “demounted” and moved elsewhere if needed.  A steel gantry-like “portal frame” was the load-bearing structure of the house, with the roof usually made of aluminum, and the exterior panels made of wood, aluminum or composite material.  Many of these were manufactured in the size ranges requested by Ministry of Reconstruction.  During a visit to Prouvé’s Maxéville workshop in 1949, Eugène Claudius-Petit, then the Minister of Reconstruction and Urbanism, expressed his determination to encourage the industrial production of “newly conceived (prefabricated) economical housing.”

French post-WW II prefabricated aluminum and steel houses

Today, many of Prouvé’s demountable aluminum and steel houses are preserved by architecture and art collectors Patrick Seguin (Galerie Patrick Seguin) and Éric Touchaleaume (Galerie 54 and la Friche l’Escalette). Ten of Prouvé’s Standard Houses and four of his Maison coques-style houses built between 1949 – 1952 are residences in the small development known as Cité “Sans souci,” in the Paris suburbs of Muedon.

Prouvé’s 1954 personal residence and his relocated 1946 workshop are open to visitors from the first weekend in June to the last weekend in September in Nancy, France.  The Musée des Beaux-Arts de Nancy has one of the largest public collections of objects made by Prouvé.

Author Elisabeth Blanchet reports that the museum “Mémoire de Soye has managed to rebuild three different ‘baraques’: a UK 100, a French one and a Canadian one. They are refurbished with furniture from the war and immediate post-war era. Mémoire de Soye is the only museum in France where you can visit post-war prefabs.”  The museum is located in Lorient, Brittany. Their website (in French) is here:  http://www.soye.org

The three wood frame ‘baraques’ at Mémoire de Soye.  Source: Elisabeth Blanchet via the Prefab Museum (UK)

You’ll find more information on French post-WW II prefabricated aluminum and steel houses in my article on Jean Prouvé’s demountable houses at the following link: https://lynceans.org/wp-content/uploads/2020/06/Jean-Prouvé-demountable-houses-converted.pdf

5.  In conclusion

In the U.S., the post-war mass production of prefabricated aluminum and steel houses never materialized.  Lustron was the largest manufacturer with 2,498 houses. In the UK, over 92,800 prefabricated aluminum and steel temporary bungalows were built as part of the post-war building boom that delivered a total of 156,623 prefabricated temporary houses of all types between 1945 and 1949, when the program ended.  In France, hundreds of prefabricated aluminum and steel houses were built after WW II, with many being used initially as temporary housing for people displaced by the war.  Opportunities for mass production of such houses did not develop in France.

The lack of success in the U.S. arose from several factors, including:

  • High up-front cost to establish a mass-production line for prefabricated housing, even in a big, surplus wartime factory that was available to the house manufacturer on good financial terms.
  • Immature supply chain to support a house manufacturing factory (i.e., different suppliers are needed than for the former aircraft factory).
  • Ineffective sales, distribution and delivery infrastructure for the manufactured houses.
  • Diverse, unprepared local building codes and zoning ordnances stood in the way of siting and erecting standard design, non-conventional prefab homes.
  • Opposition from construction unions and workers that did not want to lose work to factory-produced homes.
  • Only one manufacturer, Lustron, produced prefab houses in significant numbers and potentially benefitted from the economics of mass production.  The other manufacturers produced in such small quantities that they could not make the transition from artisanal production to mass production.  
  • Manufacturing cost increases reduced or eliminated the initial price advantage predicted for the prefabricated aluminum and steel houses, even for Lustron.  They could not compete on price with comparable conventionally constructed houses.
  • In Lustron’s case, charges of corporate corruption led the Reconstruction Finance Corporation to foreclose on Lustron’s loans, forcing the firm into an early bankruptcy.

From these post-WW II lessons learned, and with the renewed interest in “tiny homes”, it seems that there should be a business case for a modern, scalable, smart factory for the low-cost mass-production of durable prefabricated houses manufactured from aluminum, steel, and/or other materials.  These prefabricated houses could be modestly-sized, modern, attractive, energy efficient (LEED-certified), and customizable to a degree while respecting a basic standard design. These houses should be designed for mass production and siting on small lots in urban and suburban areas.  I believe that there is a large market in the U.S. for this type of low-price housing, particularly as a means to address the chronic affordable housing shortages in many urban and suburban areas.  However, there still are great obstacles to be overcome, especially where construction industry labor unions are likely to stand in the way and, in California, where nobody will want a modest prefabricated house sited next to their McMansion.

You can download a pdf copy of this post, not including the individual articles, here: 

https://lynceans.org/wp-content/uploads/2020/06/Post-WW-II-aluminum-steel-prefab-houses-converted.pdf


6.  For additional information

US post-WW II housing crisis and prefabricated homes:

UK post-WW II housing crisis and prefabricated home:

French post-WW II housing crisis and prefabricated homes:

The Moon has Never Looked so Colorful

Peter Lobner

On 20 April 2020, the U.S. Geological Survey (USGS) released the first-ever comprehensive digital geologic map of the Moon.  The USGS described this high-resolution map as follows:

“The lunar map, called the ‘Unified Geologic Map of the Moon,’ will serve as the definitive blueprint of the moon’s surface geology for future human missions and will be invaluable for the international scientific community, educators and the public-at-large.”

Color-coded orthographic projections of the “Unified Geologic Map of the Moon” showing the geology of the Moon’s near side (left) and far side (right).  Source:  NASA/GSFC/USGS

You’ll find the USGS announcement here:  https://www.usgs.gov/news/usgs-releases-first-ever-comprehensive-geologic-map-moon

You can view an animated, rotating version of this map here:  https://www.youtube.com/watch?v=f2Nt7DxUV_k

This remarkable mapping product is the culmination of a decades-long project that started with the synthesis of six Apollo-era (late 1960s – 1970s) regional geologic maps that had been individually digitized and released in 2013 but not integrated into a single, consistent lunar map. 

This intermediate mapping product was updated based on data from the following more recent lunar satellite missions:

  • NASA’s Lunar Reconnaissance Orbiter (LRO) mission:
    • The Lunar Reconnaissance Orbiter Camera (LROC) is a system of three cameras that capture high resolution black and white images and moderate resolution multi-spectral images of the lunar surface: http://lroc.sese.asu.edu
    • Topography for the north and south poles was supplemented with Lunar Orbiter Laser Altimeter (LOLA) data: https://lola.gsfc.nasa.gov
  • JAXA’s (Japan Aerospace Exploration Agency) SELENE (SELenological and ENgineering Explorer) mission:

The final product is a seamless, globally consistent map that is available in several formats: geographic information system (GIS) format at 1:5,000,000-scale, PDF format at 1:10,000,000-scale, and jpeg format.

At the following link, you can download a large zip file (310 Mb) that contains a jpeg file (>24 Mb) with a Mercator projection of the lunar surface between 57°N and 57°S latitude, two polar stereographic projections of the polar regions from 55°N and 55°S latitudes to the poles, and a description of the symbols and color coding used in the maps.

https://astrogeology.usgs.gov/search/map/Moon/Geology/Unified_Geologic_Map_of_the_Moon_GIS_v2

These high-resolution maps are great for exploring the lunar surface in detail. A low-resolution copy (not suitable for browsing) is reproduced below.

For more information on the Unified Geologic Map of the Moon, refer to the paper by C. M. Fortezzo, et al., “Release of the digital Unified Global Geologic Map of the Moon at 1:5,000,000-scale,” which is available here:  https://www.hou.usra.edu/meetings/lpsc2020/pdf/2760.pdf

Frank Lloyd Wright’s 1956 Mile-High Skyscraper – The Illinois

Updated 9 May 2020

Peter Lobner

1.  Introduction to the Mile-High Skyscraper

On 16 October 1956, architect Frank Lloyd Wright, then 89 years old, unveiled his design for the tallest skyscraper in the world, a remarkable mile-high tripod spire named “The Illinois,” proposed for a site in Chicago.

Frank Lloyd Wright.
Source: Al Ravenna via Wikipedia

Also known as the Illinois Mile-High Tower, Wright’s skyscraper would stand 528 floors and 5,280 feet (1,609 meters) tall plus antenna; more than four times the height of the Empire State Building in New York City, then the tallest skyscraper in the world at 102 floors and 1,250 feet (380 meters) tall plus antenna. At the unveiling of The Illinois at the Sherman House Hotel in Chicago, Wright presented an illustration measuring more than 25 feet (7.6 meters) tall, with the skyscraper drawn at the scale of 1/16 inch to the foot.

Frank Lloyd Wright presents The Illinois at the Sherman House Hotel in Chicago on 26 October 1956.  Source: IBM.com/blog

Basic parameters for The Illinois are listed below:

  • Floors, above grade level:    528
  • Height:
    • Architectural:                5,280 ft (1,609.4 m)
    • To tip of antenna:        5,706 ft (1739.2 m)
  • Number of elevators:             76
  • Gross floor area (GFA):         18,460,106 ft² (1,715,000 m²)
  • Number of occupants:           100,000
  • Number of parking spaces:  15,000
  • Structural material:
    • Core:                                  Reinforced concrete
    • Cantilevered floors:    Steel
    • Tensioned tripod:        Steel 

The Illinois was intended as a mixed-use structure designed to spread urbanization upwards rather than outwards. The Illinois offered nearly three times the gross floor area (GFA) of the Pentagon, and more than seven times the GFA of the Empire State Building for use as office, hotel, residential and parking space. Wright said the building could consolidate all government offices then scattered around Chicago.

The single super-tall skyscraper was intended to free up the ground plane by eliminating the need for other large skyscrapers in its vicinity.  This was consistent with Wright’s distributed urban planning concept known as Broadacre City, which he introduced in the mid-1930s and continued to advocate until his death in 1959.

Sketch for Frank Lloyd Wright’s proposed mile high skyscraper, 
The Illinois.  Source:  Wright Mile Gallery, MCM Daily
Frank Lloyd Wright illustration and data sheet for The Illinois.  
Source:  https://www.artbook.com/blog-frank-lloyd-wright-skyscraper.html
Frank Lloyd Wright illustrations of The Illinois.  
L to R:  Cross-section; Back exterior view; Front exterior view;  Side exterior view.  
Source:  Wright Mile Gallery, MCM Daily
Close-up view of the five-story base of The Illinois. 
Source:  Frank Lloyd Wright Foundation
Illustration of the footprint of The Illinois base and tower.
Source: Source:  Wright Mile Gallery, MCM Daily
Frank Lloyd Wright illustration of The Illinois, showing the five-story base structure and the transition of the central reinforced concrete core into the “taproot” foundation structure.  In the background are scale silhouettes of famous tall structures: Eiffel Tower, the Great Pyramid, and Washington Monument.  Source:  Wright Mile Gallery, MCM Daily

2.  Tenuity, continuity and evolution of Wright’s concept for an organic high-rise building

Two aspects of Wright’s concept of organic architecture are the structural principles he termed “tenuity” and “continuity,” both of which he applied in the context of cantilevered and cable-supported structures, such as slender buildings and bridges.  Author Richard Cleary reported that Wright first used the term tenuity in his 1932 book Autobiography, and offered his most succinct explanation in his 1957 book Testament.

  • “The cantilever is essentially steel at its most economical level of use. The principle of the cantilever in architecture develops tenuity as a wholly new human expression, a means, too, of placing all loads over central supports, thereby balancing extended load against opposite extended load.”
  • “This brought into architecture for the first time another principle in construction – I call it continuity – a property which may be seen as a new, elastic, cohesive, stability. The creative architect finds here a marvelous new inspiration in design. A new freedom involving far wider spacing of more slender supports.”
  • “Thus architecture arrived at construction from within outward rather than from outside inward; much heightening and lightening of proportions throughout all building is now economical and natural, space extended and utilized in a more liberal planning than the ancients could ever have dreamed of. This is now the prime characteristic of the new architecture called organic.”
  • “Construction lightened by means of cantilevered steel in tension makes continuity a most valuable characteristic of architectural enlightenment.”

The structural principles of tenuity and continuity are manifest in Wright’s high-rise building designs that are characterized by a deep “taproot” foundation that supports a central load bearing core structure from which the individual floors are cantilevered.  A cross-section of the resulting building structure has the appearance of a tree deeply rooted in the Earth with many horizontal branches. 

Before looking further at the Mile-High Skyscraper, we’ll take a look at three of its high-rise predecessors and one later design, all of which shared Wright’s characteristic organic architectural features derived from the application of tenuity and continuity:  taproot foundation, load-bearing core structure and cantilevered floors:

  • St. Mark’s Tower project
  • SC Johnson Research Tower
  • Price Tower
  • The Golden Beacon

St. Mark’s Tower project (St. Mark’s-in-the-Bouwerie, 1927 – 1931, not built)

Wright first proposed application of the taproot foundation, load-bearing concrete and steel core structure and cantilevered floors was in 1927 for the 15-floor St. Mark’s Tower project in New York City.  

The planned St. Mark’s Tower project in the Bowery, New York City.  Source: Architectural Record, 1930, via The New Yorker
St. Mark’s Tower exterior view (L) and cross-section (R) showing the central core and cantilevered floors. The deep taproot part of the foundation is not shown.  
Sources: (L) Architectural Record, 1930, via The New Yorker; 
(R) adapted from Frank Lloyd Wright Foundation drawing

The New York Metropolitan Museum of Modern Art (MoMA) provides this description of the St. Mark’s Tower project.

  • “The design of these apartment towers for St. Mark’s-in-the-Bouwerie in New York City stemmed from Wright’s vision for Usonia, a new American culture based on the synthesis of architecture and landscape. The organic “tap-root” structural system resembles a tree, with a central concrete and steel load-bearing core rooted in the earth, from which floor plates are cantilevered like branches.”
  • “This system frees the building of load-bearing interior partitions and supports a modulated glass curtain wall for increased natural illumination. Floor plates are rotated axially to generate variation from one level to the next and to distinguish between living and sleeping spaces in the duplex apartments.”

While the St. Mark’s Tower project was not built, this basic high-rise building design reappeared from the mid-1930s to the mid-1960s as a “city dweller’s unit” in Wright’s Broadacre City plan and was the basis for the Price Tower built in the 1950s.  

SC Johnson Research Tower, Racine, WI (1943 – 1950)

The 15-floor, 153 foot (46.6 m) tall SC Johnson Research Laboratory Tower, built between 1943 and 1950 in Racine, WI, was the first high-rise building to actually apply Wright’s organic design with a taproot foundation, load-bearing concrete and steel core structure and cantilevered floors.  On their website, SC Johnson describes the structural design of this building as follows:

  • “One of Frank Lloyd Wright’s famous buildings, the tower rises more than 150 feet into the air and is 40 feet square. Yet at ground level, it’s supported by a base only 13 feet across at its narrowest point. As a result, the tower almost seems to hang in the air – a testament to creativity and an inspiration for the innovative products that would be developed inside.”
  • “Alternating square floors and round mezzanine levels make up the interior, and are supported by the “taproot” core, which also contains the building’s elevator, stairway and restrooms. The core extends 54 feet into the ground, providing stability like the roots of a tall tree.”
The SC Johnson Research Tower exterior & cross-section views. The taproot foundation extends 54 feet into the ground and the central core supports 15 cantilevered floors.  Sources: (L) https://www.flickr.com/photos/88017382@N00/35847749345
(R) https://www.scjohnson.com

Because of the change in fire safety codes, and the impracticality of retrofitting the building to meet current code requirements, SC Johnson has not used the Research Tower since 1982.  However, they restored the building in 2013 and now the public can visit as part of the SC Johnson Campus Tour.  

You can make reservations at the following link for the Campus Tour and a separate tour of the nearby Herbert F. Johnson Prairie-style home, Wingspread, also designed by Frank Lloyd Wright: https://reservations.scjohnson.com/Info.aspx?EventID=8

Price Tower, Bartlesville, OK (1952 – 1956)

The 19-floor, 221 foot (67.4 m) tall Price Tower, completed in 1956 in Bartlesville, OK, is an evolution of Wright’s 1927 design for the St. Mark’s Tower project.  Wright nicknamed the Price Tower, “the tree that escaped the crowded forest,” referring to the building’s cantilever construction and the origin of its design in a project for New York City.  Price Tower also has been called the “Prairie Skyscraper.”  

Price Tower exterior view (L) and cross-section (R).  
Sources:  (L) http://www.greatbuildings.com/  
(R) https://mgerwingarch.com/m-gerwing/2012/05/28/price-tower

H.C. Price commissioned Frank Lloyd Wright to design Price Tower, which served as his corporate headquarters until 1981 when it was sold to Phillips Petroleum.  Philips deemed the exterior exit staircase a safety risk and only used the building for storage until 2000, when the building was donated to the Price Tower Arts Center.  Since then, Price Tower has been returned to its multi-use origins and public tours are offered, including a visit to the restored 19th floor executive office of H.C. Price and the H.C. Price Company corporate apartment with the original Wright interiors.  You can arrange your tour here: https://www.pricetower.org/tour/

You also can stay at the Inn at Price Tower, which has seven guest rooms.  You’ll find details here:  https://www.pricetower.org/stay/

The Golden Beacon, Chicago, IL (1959, not built)

The Golden Beacon was a concept for a 50-floor mixed-use office and residential apartment building in Chicago, IL.  

The Golden Beacon exterior view (L), cross-section showing taproot foundation,
central core and cantilever floors. (R).  
Sources:  (L) https://stoutbooks.com/,  (R) Richard Cleary, “Lessons in Tenuity….”

As shown in the cross-section diagram, the building design followed Wright’s practice with a deep taproot foundation, a central load-bearing core and cantilevered floors. This design is very similar to the foundation structure proposed for the earlier Mile-High Skyscraper.

The Golden Beacon exterior view. Source:  Frank Lloyd Wright Foundation via https://treedowntown.com/

3.  Extrapolating to the Mile-High Skyscraper

By 1956, Wright’s characteristic organic architectural features for high-rise buildings, derived from the application of tenuity and continuity, had only appeared in two completed high-rise buildings, the 15-floor SC Johnson Laboratory Tower and the 19-floor Price Tower.  These two important buildings demonstrated the practicality of the taproot foundation, load-bearing concrete and steel core structure and cantilevered floors for tall, slender buildings.  With the unveiling of The Illinois, Wright made a remarkable extrapolation of these architectural principles in his conceptual design of this breathtaking 528 floor, 5,280 feet (1,609 meters) tall skyscraper.

Blaire Kamin, writing for the Chicago Tribune in 2017, reported:  “The Mile-High didn’t simply aim to be tall. It was the ultimate expression of Wright’s “taproot” structural system, which sank a central concrete mast deep into the ground and cantilevered floors from the mast. In contrast to a typical skyscraper, in which same-size floors are piled atop one another like so many pancakes, the taproot system lets floors vary in size, opening a high-rise’s interior and letting space flow between floors.”

In addition to the central core to support the building’s dead loads, The Illinois also incorporated an external tensioned steel tripod structure to resist external wind loads and other flexing loads (i.e., earthquakes), distributing those loads through the integral steel structure of the tripod, and resisting oscillations.  In his book, “Testament,” Wright stated: 

“Finally – throughout this lightweight tensilized structure, because of the integral character of all members, loads are at equilibrium at all points, doing away with oscillations.  There would be no sway at the peak of The Illinois.”

Tuned mass dampers (TMD) for reducing the amplitude of mechanical vibrations in tall buildings had not been invented when Wright unveiled his design for The Illinois in 1956. The first use of a TMD in a skyscraper did not occur until the mid-1970s, first as a retrofit to the troubled, 790 foot (241 m) tall, John Hancock building completed in 1976 in Boston, and then as original equipment in the 915 foot (279 m) tall Citicorp Tower completed in 1977 in New York City.  While tenuity and continuity may have given The Illinois unparalleled structural stability, I wouldn’t be surprised if TMD technology would have been needed for the comfort of the occupants on the upper floors, three-quarters of a mile above their counterparts in the next tallest building in the world.

To handle its 100,000 occupants, The Illinois had 76 elevators that were divided into five groups, each serving a 100-floor segment of the building, with a single elevator serving only the top floors.  Each elevator was a five-story unit that moved on rails and served five floors simultaneously.  With the tapering, pyramidal shape of the skyscraper, the vertical elevator shaft structures eventually extended beyond the sloping exterior walls, forming protruding parapets on the sides of the building.  In his 1957 book, “A Testament,” Wright said the elevators were designed to enable building evacuation within one hour, in combination with the escalators that serve the lowest five floors.

Wright alluded to the building (and the elevators) being “atomic powered,” but there were no provisions for a self-contained power plant as part of the building.  The much smaller Empire State Building currently has a peak electrical demand of almost 10 megawatts (MW) in July and August after implementing energy conservation measures.  Scaling on the basis of gross floor area, The Illinois could have had a peak electrical demand of about 70 MW.  You’ll find more information on current Empire State Building energy usage here: https://www.esbnyc.com/sites/default/files/esb_overall_retrofit_fact_sheet_final.pdf

The 2012 short video by Charles Muench, “A Peaceful Day in BroadAcre City – One Mile High – Frank Lloyd Wright” (1:31 minutes), depicts The Illinois skyscraper in the spacious setting of Broadacre City and shows an animated construction sequence of the tower.  Two screenshots from the video are reproduced below.  You’ll find this video at the following link: https://www.dailymotion.com/video/xp86uo

Two views of the start of The Illinois construction sequence.
Screenshots from Charles Muench video, 2012.

You can see more architectural details in the 2009 video, “Mile High Final Movie – Frank Lloyd Wright” (3:42 minutes), produced for the Guggenheim Museum, New York.  Two screenshots are reproduced below.  You’ll find the video here: https://vimeo.com/4937909

The Illinois, showing architectural exterior details.
Screenshot from Guggenheim video, 2009.
The top of The Illinois, showing details at the 528th floor, including the protruding parapets for the elevators, and the 420+ foot (128 m) antenna on top.  Screenshot from Guggenheim video, 2009.

In his 1957 book, Testament, Wright provided the following two architectural drawings showing typical details of the cantilever construction of The Illinois.

The Illinois was intended for construction in a spacious setting like Broadacre City, rather than in a congested big-city downtown immediately adjacent to other skyscrapers.  Two views of The Illinois in these starkly different settings are shown below.

Model of The Illinois.  Source:  Milwaukee Sentinel Journal
The Illinois skyscraper as part of Frank Lloyd Wright’s mid-1950s landscape for his urban planning concept known as Broadacre City.   Source: utopicus2013.blogspot
Artist’s concept of The Illinois skyscraper punctuating a rather congested contemporary Chicago skyline, not quite as Frank Lloyd Wright envisioned.  Source: Neoman Studios

4.  Wright’s Mile-High Skyscraper on Exhibit at MoMA

Since Wright’s death in 1959, his archives have been in the care of the Frank Lloyd Wright Foundation (https://franklloydwright.org/frank-lloyd-wright/) and stored at Wright’s homes / architectural schools at Taliesin in Spring Green, WI and Taliesin West, near Scottsdale, AZ.

In September 2012, Mary Louise Schumacher, writing for the Milwaukee Sentinel Journal, reported that Columbia University and the Museum of Modern Art (MoMA) in Manhattan had jointly acquired the Frank Lloyd Wright archives, which consist of architectural drawings, large-scale models, historical photographs, manuscripts, letters and other documents.  You’ll find her report here: http://archive.jsonline.com/newswatch/168457936.html

Columbia University’s Avery Architectural & Fine Arts Library (https://library.columbia.edu/libraries/avery/da.html) will be the keeper of all of Wright’s paper archives, as well as interview tapes, transcripts and films. MoMA (https://www.moma.org) will add Wright’s three-dimensional models to its permanent collection.

The Frank Lloyd Wright Foundation will retain all copyright and intellectual property responsibilities for the archives, and all three organizations hope to see the archives placed online at some point in the future.

On 12 June 2017, MoMA opened its exhibit, “Frank Lloyd Wright at 150: Unpacking the Archive,” which ran thru 1 October 2017.  You can take an online tour of this exhibit, which included Wright’s plans for The Illinois, here: https://www.moma.org/calendar/exhibitions/1660

MoMA’s curator of the Wright collection, Barry Bergdoll, provided an introduction to the trove of recently acquired documentation on The Illinois in a short 2017 video (4:32 minutes) at the following link: https://www.youtube.com/watch?v=VhUDu0Q08UA

Plans and sketches for The Illinois mile-high skyscraper at the 
2017 MoMA exhibit.  Source:  MoMA

You can download a pdf copy of this article here: https://lynceans.org/wp-content/uploads/2020/05/Frank-Lloyd-Wright_-1956-Mile-High-Skyscraper_R1.pdf

5.  For more information

Frank Lloyd Wright’s Mile-High Skyscraper, The Illinois:

Frank Lloyd Wright’s concept for Broadacre City:

Frank Lloyd Wright’s related organic high-rise building designs:

Also check out the following short videos:

Working Toward a More Detailed View of a Black Hole

Peter Lobner, updated 17 August 2021

1.  Introduction

The Event Horizon Telescope (EHT) Collaboration reported a great milestone on 10 April 2019 when they released the first synthetic image showing a luminous ring around the shadow of the M87 black hole.

First synthetic image of the M87 black hole.
Source: Event Horizon Telescope Collaboration

The  bright emission ring surrounding the black hole was estimated to have an angular diameter of about 42 ± 3 μas (microarcseconds), or 1.67 ± 0.08 e-8 degrees, at a distance of 55 million light years from Earth.  At the resolution of the EHT’s first black hole image, it was not possible to see much detail of the ring structure.   

Significantly improved telescope performance is required to discern more detailed structures and, possibly, time-dependent behavior of spacetime in the vicinity of a black hole.  The EHT Collaboration has a plan for improving telescope performance.  A challenging new observational goal has been established by scientists who recently postulated the existence of a “photon ring” around a black hole.  Let’s take a look at these matters.

2. Improving the performance of the EHT terrestrial observatory network

As I described in my 3 March 2017 post on the EHT, a very long baseline interferometry (VLBI) array with the diameter of the Earth (12,742 km, 1.27e+7 meters) operating in the EHT’s millimeter / submillimeter wavelength band (1.3 mm to 0.6 mm) has a theoretical angular resolution of 25 to 12 μas, with the better resolution at the shorter wavelength.

The EHT team plans to improve telescope performance in the following key areas:

Improve the resolution of the EHT

  • Observe at shorter wavelengths:  The EHT’s first black hole image was made at a wavelength of 1.3 mm (230 GHz). Operating the telescopes in the EHT array at a shorter wavelength of 0.87 mm (frequency of 345 GHz) will improve angular resolution by about 40%.  This upgrade is expected to start after 2020 and take 3 – 5 years to deploy to all EHT observatories.
  • Extend baselines: Adding more terrestrial radio telescopes will lengthen some observation baselines, up to the limit of the Earth’s diameter. 

Improve the sensitivity of the EHT

  • Collect data at multiple frequencies (wide bandwidth): Black holes emit radiation at many frequencies.  EHT sensitivity and signal-to-noise ratio can be improved by increasing the number of frequencies that are monitored and recorded during EHT observations.  This requires multi-channel receivers and faster, more capable data processing and recording systems at all EHT observatories. 
  • Increase the EHT aperture:  The EHT team notes that the most straightforward way to boost the sensitivity of the EHT is to increase the net collecting area of the dishes in the array.  You can all of the observatories participating in EHT here:  https://eventhorizontelescope.org/blog/global-web-tour-eht-observatories

The size of individual radio telescopes in the EHT array vary from the 12 m Greenland Telescope with an aperture of about 113 square meters to the 50 m Large Millimeter Telescope (LMT) in Mexico with an aperture of about 2,000 square meters.  

  • The telescope with the largest aperture is the phased ALMA array, which is comprised of up to 54 x 12 m telescopes with a effective aperture of about 7,200 square meters.  The Greenland Telescope originally was a prototype for the ALMA array and was relocated to Greenland to support VLBI astronomy.
  • A phased array is an effective solution for VLBI observations because the requirements for mechanical precision and rigidity of the dish are easier to meet with a smaller radio telescope dish that can be manufactured in large numbers.

With higher angular resolution and improved sensitivity, and with more powerful signal processing to handle the greater volume of data, it may be possible for the EHT to “see” some detailed structures around a black hole.  Multiple images of a black hole over a period of time could be used to create a dynamic set of images (i.e., a short “video”) that reveal time-dependent black hole phenomena.    

You’ll find more information on these telescope system upgrades on the EHT website here:(https://eventhorizontelescope.org/technology).

3. Photon ring:   New insight into the fine structure in the vicinity of a black hole

On 18 March 2020, a team of scientists postulated the existence of a “photon ring” closely orbiting a black hole.  The scientists further postulated that the “glow” from the first few photon sub-rings may be directly observable with a VLBI array like the EHT. 

Time-averaged results of computer simulations of the photon ring surrounding the M87 black hole.  
Source:  Michael Johnson, et al., 18 March 2020

The abstract and part of the summary of the paper are reproduced below.

  • Abstract:  “The Event Horizon Telescope image of the supermassive black hole in the galaxy M87 is dominated by a bright, unresolved ring. General relativity predicts that embedded within this image lies a thin “photon ring,” which is composed of an infinite sequence of self-similar subrings that are indexed by the number of photon orbits around the black hole. The subrings approach the edge of the black hole “shadow,” becoming exponentially narrower but weaker with increasing orbit number, with seemingly negligible contributions from high-order subrings. Here, we show that these subrings produce strong and universal signatures on long interferometric baselines. These signatures offer the possibility of precise measurements of black hole mass and spin, as well as tests of general relativity, using only a sparse interferometric array.”
  • Summary: “In summary, precise measurements of the size, shape, thickness, and angular profile of the nth photon subring of M87 and Sgr A* may be feasible for n = 1 (the first ring) using a high-frequency ground array or low Earth orbits, for n = 2 (the second ring) with a station on the Moon, and for n = 3 (the third ring) with a station in L2 (Lagrange Point).”
Five Lagrange points in the Earth-Sun system. 
L2 is behind the Earth.  Source: NASA

The complete, and quite technical, 18 March 2020 paper by Michael Johnson, et al., “Universal interferometric signatures of a black hole’s photon ring,” is available on the Science Advances website here:  https://advances.sciencemag.org/content/6/12/eaaz1310

You’ll find a more narrative summary by Camille Carlisle, writing for SkyandTelescope.com, here:  https://skyandtelescope.org/astronomy-news/scientists-predict-countless-rings-of-light-encircle-black-holes/

4.  EHT images black hole-powered relativistic jets

On 7 April, 2020, the EHT Collaboration reported that it had produced images with the finest detail ever seen of relativistic jets produced by a supermassive black hole.  The target of their observation was Quasar 3C 279, which contains a black hole about one billion times more massive than our Sun, and is about 5 billion light-years away from Earth in the constellation Virgo.  

With a resolution of 20 μas (microarcseconds) for observations at a wavelength of 1.3 mm, the EHT imaging revealed that two relativistic jets existed.  As shown in the following figure, lower resolution imaging by the Global 3mm VLBI Array (GMVA) and a VLBI array observing at 7 mm wavelength did not show two distinct jets. 

Illustration of multi-wavelength 3C 279 jet structure in April 2017.
The observing dates, arrays, and wavelengths are noted at each panel. Source: J.Y. Kim (MPIfR), Boston University Blazar Program (VLBA and GMVA), and Event Horizon Telescope Collaboration

In their 7 April 2020 press release, the EHT Collaboration reported:  “For 3C 279, the EHT can measure features finer than a light-year across, allowing astronomers to follow the jet down to the accretion disk and to see the jet and disk in action. The newly analyzed data show that the normally straight jet has an unexpected twisted shape at its base and revealing features perpendicular to the jet that could be interpreted as the poles of the accretion disk where the jets are ejected. The fine details in the images change over consecutive days, possibly due to rotation of the accretion disk, and shredding and infall of material, phenomena expected from numerical simulations but never before observed.”

Time-dependent behavior of the two relativistic jets from 
Quasar 3C 279.  Source:  Screenshot from 
Event Horizon Telescope Collaboration video

The following short video (1:14 minutes) from the EHT Collaboration shows the 3C 279 quasar jets and their motion over the course of one week, from 5 April to 11 April 2017, as observed by the EHT.

5. Adding space-based EHT observatories

Imaging the M87 photon ring will be a challenging goal for future observations with an upgraded EHT.  As indicated in the paper by Michael Johnson, et al., an upgraded terrestrial EHT array may be able to “see” the first photon sub-ring.  However, space-based telescopes will be needed to significantly extend the maximum 12,742 km (7,918 miles) baseline of the terrestrial EHT array and provide a capability to image the photon ring in greater detail.

Here’s how the EHT terrestrial baseline would change with space-based observatories:

  • Low Earth orbit (LEO):  Add 370 – 460 km (230 – 286 miles) for a single telescope in an orbit similar to the International Space Station
  • Geosynchronous orbit: Add 35,786 km (22,236 mi) for a single telescope, or up to twice that for multiple telescopes
  • Moon: Add Earth-Moon average distance: 384,472 km (238,900 miles)
  • L2 Lagrange point: Add about 1.5 million km (932,057 miles)

It seems to me that several EHT observatories in geosynchronous orbits could be a good solution that could be implemented sooner than an observatory on the Moon or at L2.  Geosynchronous telescopes would greatly expand the EHT baseline and the spacecraft could make long observing runs from orbital positions that are relatively fixed in relation to the terrestrial EHT sites.  In-orbit servicing would be more practical in geosynchronous orbit than at L2.  In February 2020, Northrop-Grumman demonstrated the ability to remotely restore a large communications satellite that was running out of fuel in geosynchronous orbit.  With remote servicing, a geosynchronous observatory could have a long operating life.

6. In conclusion:

With the ongoing improvements to the terrestrial EHT array and its data recording and processing systems, we should see many more black hole observations reported in the years ahead.  I’m looking forward to direct observation of M87’s photon ring and the first look at the Sagittarius A* black hole near the center of our Milky Way galaxy.  The time delay between data acquisition (i.e., from a series of observation runs of a particular target) and reporting is about three years. This is understandable given the mass of data that must be aggregated from the many EHT observatories to synthesize images of a target black hole.  Hopefully, this time delay can be shortened in the years ahead. 

Within the next decade, a plan to expand the EHT array to include orbital and/or lunar observatories could be in developed.  Hopefully, funding for spacecraft development and deployment will follow.

7. For more information:

See the following sources for more information on the EHT and imaging a black hole:

SuperTrucks – Revolutionizing the Heavy Tractor-Trailer Freight Industry with Science

Peter Lobner, updated 15 March 2024

1. Introduction

On a 2016 road trip to the Black Hills, I had long transit days each way on Interstate 90 through southern Minnesota and South Dakota.  One thing I noticed was that many of the heavy tractor-trailers on this high speed route were modern, streamlined vehicles that used a variety of aerodynamic devices that appeared useful for reducing aerodynamic drag and fuel consumption.

These tractor-trailers are Class 8 heavy trucks with a gross vehicle weight (GVW) of greater than 33,000 pounds (14,969 kg).  The maximum GVW is set on a case-by-case basis using the Federal Bridge Formula Weights published by the Department of Transportation’s (DOT) Federal Highway Administration (FHWA) at the following link: https://ops.fhwa.dot.gov/freight/publications/brdg_frm_wghts/index.htm

For example, a long 5-axle tractor-trailer, commonly called an “18-wheeler,” can have a GVW up to 85,500 pounds (38,782 kg), but it is limited to a maximum GVW of 80,000 pounds (36,287 kg) when operating on federal interstate highways.  The higher weight limit may apply on other roads if permitted by state and local jurisdictions.

Class 8 Trucks make up only 4% of the vehicles on the road.  However, they use about 20% of the nation’s transportation fuel.  The following Department of Energy (DOE) video, entitled “Energy 101: Heavy Duty Vehicle Efficiency,” provides an introduction to what’s being done to introduce a variety of new technologies that will improve the performance and economy of Class 8 tractor-trailers while reducing their environmental impact:  https://www.energy.gov/eere/videos/energy-101-heavy-duty-vehicle-efficiency

In this post, we’ll take a look at the following:

  • Three US and Canadian programs to improve tractor-trailer aerodynamics, fuel efficiency and freight efficiency:
    • US Environmental Protection Agency (EPA) SmartWay® Transport Partnership
    • Canadian Center for Surface Transportation Technology
    • US Department of Energy (DOE) SuperTruck program
  • The North American Council for Freight Efficiency’s (NACFE) Annual Fleet Fuel Study for 2019, which provides insights into the current state of the US Class 8 tractor-trailer fleet. 
  • Accessories available to improve the aerodynamic efficiency of existing Class 8 tractor-trailers.
  • Aerodynamic Class 8 tractor-trailers from major US manufacturers, including:
    • Manufacturer’s flagship Class 8 trucks 
    • Test trucks developed for the DOE SuperTruck program
  • Other advanced Class 8 truck designs and test trucks that are demonstrating new freight vehicle technologies. 
  • Electric-powered Class 8 trucks that are about to enter service with the potential to revolutionize the freight trucking industry.

You can download this post as a pdf file here:  https://lynceans.org/wp-content/uploads/2020/04/SuperTrucks-–-Revolutionizing-the-Heavy-Tractor-Trailer-Freight-Industry-with-Science.pdf.    

In the body of this post are links to 12  individual articles I’ve written on advanced Class 8 trucks, each of which can be downloaded as a pdf file.  You’ll also find many other links to useful external resources.

2. US and Canadian programs to improve tractor-trailer aerodynamics and freight efficiency

Freight transportation is a cornerstone of the U.S. economy. In 2012, U.S. businesses spent $1 trillion to move $12 trillion worth of goods (8.5% of GDP).  However, freight accounts for 9% of all U.S. greenhouse gas (GHG) emissions, and trucking is the dominant mode.  The following programs are focused on reducing the GHG emissions of the freight trucking industry. 

2.1  US SmartWay® Transport Partnership

The trucking industry’s ongoing efforts to improve heavy freight vehicle performance and economics were aided in 2004 by the creation of the SmartWay® Transport Partnership, which is administered by the Environmental Protection Agency (EPA). SmartWay® is a voluntarily program for achieving improved fuel efficiency and reducing the environmental impacts from freight transport.  The goal is, “to move more freight, more miles, with lower emissions and less energy.”  The SmartWay® website is at the following link:  https://www.epa.gov/smartway

SmartWay® is promoting the following strategies to help the heavy trucking industry meet this goal:

  • Idle reduction
  • Speed control
  • Driver training
  • Aerodynamics
  • Tire technologies
  • Lubricants
  • Hybrid power trains
  • Improved freight logistics
  • Vehicle weight reduction
  • Intermodal freight capability
  • Alternative fuels
  • Long combination vehicles (LVCs, such as double trailers)

A truck and trailer fitted out with all the essential efficiency features can be sold as a SmartWay® “designated” model. A “designated” tractor-trailer combo can be as much as 20% more fuel-efficient than the comparable standard model. 

2.2  Canadian Center for Surface Transportation Technology 

In May 2012, the Canadian Center for Surface Transportation Technology (CSTT) issued technical report CSTT-HVC-TR-205, entitled, “Review of Aerodynamic Drag Reduction Devices for Heavy Trucks and Buses.”  In Table 2 of this report, CSTT provides the following table showing the relative power consumption of aerodynamic drag and rolling / accessory drag as a function of vehicle speed for a representative heavy truck on a zero grade road with properly inflated tires.  Results will be different for streamlined trucks that have already have taken steps to reduce aero drag.

Relative magnitude of drag components. Source: CSTT, 2012

In this example, rolling / accessory drag dominates at lower speeds typical of urban driving.  At 50 mph (80 kph) aerodynamic drag and rolling / accessory drag are approximately equal.  At higher speeds, aerodynamic drag dominates power consumption.  The speed limit on I-90 in South Dakota typically is 80 mph (129 kph). At this speed the aero drag contribution is even higher than shown in the above table.

Key points from this CSTT report include the following:

  • For tractor-trailers, pressure drag is the dominant component of vehicle drag, due primarily to the large surface area facing the main flow direction and the large, low-pressure wake resulting from the bluntness of the back end of the vehicle. 
  • Aero-tractor models can reduce pressure drag by about 30% over the boxy classic style tractor.
  • Friction drag occurring along the sides and top of tractor-trailers makes only a small contribution to total drag (10% or less), so these areas are not strong candidates for drag-reduction.
  • The gap between the tractor and the trailer has a significant effect on total drag, particularly if the gap is large. Eliminating the gap entirely could reduce total drag by about 7%.
  • Side skirts or underbody boxes prevent airflow from entering the under-trailer region.  These types of aero devices could reduce drag by 10 – 15%.
  • Wind-tunnel and road tests have demonstrated that a “boat tail” with a length of 24 – 32 inches (61 – 81 cm) is optimal for reducing drag due to the turbulent low-pressure region behind the trailer.
  • Adding a second trailer to form a long combination vehicle (LCV), and thus doubling the freight volumetric capacity, results in a very modest increase in drag coefficient (as low as about 10%) when compared to a single trailer vehicle. 
  • In cold Canadian climates, the aerodynamic drag in winter can be nearly 20% greater than at standard conditions, due to the ambient air density. For highway tractor-trailers, this results in about a 10% increase in fuel consumption from aerodynamic drag when compared to the reference temperature, further emphasizing the importance of aerodynamic drag reduction strategies for the Canadian climate. 

You can read an executive summary of this CSTT report at the following link:  https://www.tc.gc.ca/en/programs-policies/programs/ecotechnology-vehicles-program/etv-technical-papers/review-aerodynamic-drag-reduction-devices-heavy-trucks-buses.html

2.3  Department of Energy (DOE) SuperTruck Program

SuperTruck is major DOE technology innovation program with many industry partners representing a broad segment of the US industrial base for heavy tractor-trailers.  This program, run by DOE’s Vehicle Technologies Office, focused on Class 8 trucks with internal combustion engines during the first two five-year program phases known as SuperTruck 1 and 2.  Program focus shifted to electric powertrains in the third five-year phase known as SuperTruck 3.

Following is an overview of the SuperTruck program.  Additional sources of information are listed at the end of this post.

SuperTruck 1 (2010-2016)

The first phase, known as SuperTruck 1, was a $284 million public-private partnership in which industry matched federal grants dollar-for-dollar.  Four Class 8 truck manufacturers led teams in the SuperTruck 1 program:

  • Freightliner (Daimler North America)
  • International (Navistar)
  • Peterbilt (teamed with Cummins)
  • Volvo North America
DOE SuperTruck 1 teams.  Source:  DOE

Objectives for the DOE SuperTruck 1 program were: 

  • Demonstrate a 50% freight efficiency improvement from a “baseline” 2009 model year Class 8 tractor-trailer.
    • Freight efficiency is the product of payload weight (in tons) and fuel economy (in miles per gallon), with results reported in North America as ton-miles per gallon. 
    • Performance would be measured with a demonstration SuperTruck operated at 65,000 pounds GVW.
    • Average fuel efficiency of the baseline tractors in SuperTruck 1 was 6.2 mpg.  
  • Improve engine efficiency by 8% to achieve 50% brake thermal efficiency (BTE), and thereby boost fuel efficiency by 16%.
    • The BTE of an engine is the ratio of Brake Power (BP) to Fuel Power (FP).   
    • Brake power (BP) is the amount of power available at the crankshaft, taking into account engine friction losses (i.e., between cylinder and walls, crankshaft bearing, etc.).
    • Fuel power (FP) is a measure of the calorific value of the fuel used to deliver a particular value of BP.
    • Typical Class 8 truck diesel engines operate at 41 – 43% BTE. This means that 41 – 43% of the calorific value of the fuel is converted into power available at the crankshaft.  The remaining 57 – 59% of the calorific value of the fuel is lost as heat that is carried off by the engine cooling system and engine exhaust system.  In some advanced engines, turbochargers and waste heat recovery systems are used to increase BTE by recovering some energy from exhaust gases.
  • Show pathways for a further 5% improvement in engine efficiency (to achieve a BTE of 55%).

The four SuperTrucks developed by the respective teams are described in Section 5.  All teams met or exceeded the SuperTruck I objectives set by DOE.

SuperTruck 2 (2017 – 2022)

SuperTruck 2 is a five-year, $160-million public-private partnership with industry matching federal grants dollar-for-dollar.  Five teams are participating in the SuperTruck 2 program:

  • In August 2016, DOE announced that the four teams from SuperTruck 1 would continue their participation in SuperTruck 2.
  • A new team led by PACCAR, with truck manufacturer Kenworth as a team member, joined SuperTruck 2 in October 2017.

Objectives for the DOE SuperTruck 2 program are:

  • Improve freight efficiency (ton-miles per gallon) by 100% relative to a “best in class” 2009 truck (same baseline as in SuperTruck I), with a stretch goal of 120%.
  • Demonstrate 55% Brake Thermal Efficiency on an engine dynamometer.
  • Develop technologies that are commercially cost effective in terms of a simple payback.

Michael Berube, head of DOE’s Vehicle Technologies Office, acknowledged that the SuperTruck 2 objectives are beyond what the participants think they can achieve.  However, with industry receiving  dollar-for-dollar federal grants, Berube said, “…the program will allow them to try higher-risk technologies than they might on their own.” 

Among the candidate technologies for SuperTruck 2 are:

  • Engines with waste heat recovery
  • Various forms of hybrid diesel-electric systems 
  • More radical aerodynamic improvements, including active devices and completely redesigned cabs.

“Think of the benefit to the industry and to the country if they can meet that goal of doubling freight efficiency. There are 1.7 (to 2.5) million Class 8 trucks out there, each traveling an average of 66,000 miles a year. Doubling their efficiency could reduce petroleum consumption by 300 million barrels a year,” Berube said.  At today’s fuel costs, that would save operators up to $20,000 per truck per year.

While most SuperTruck 2 programs wrapped up in 2022, PACCAR’s program was completed at the end of 2023 due to its later starting date.

SuperTruck 3 (2022 – 2027)

In October 2021, DOE launched a $199 million, five-year program to support the development of zero-emission vehicles, with $127 million directed to the SuperTruck 3 program, which will fund 50:50 cost-sharing projects to develop battery-electric and fuel cell medium- and heavy-duty trucks and freight system solutions with payload capacity and range equivalent to typical diesel-powered counterpart vehicles.

This DOE program includes three firms from the previous SuperTruck 2 program: PACCAR Inc., Volvo Group North America and Daimler Trucks North America. 

  • PACCAR Inc.: $33 million in DOE cost-sharing funds to develop 18 Class 8 battery-electric vehicles with advanced batteries and a demonstration megawatt-class charging station.
  • Volvo Group North America: $18 million in DOE cost-sharing funds to develop a 400-mile-range Class 8 battery-electric tractor-trailer with advanced aerodynamics, electric braking, EV-optimized tires, automation and route planning. It also will develop and demonstrate a megawatt-class charging station.
  • Daimler Trucks North America: $26 million in DOE cost-sharing funds to develop and demonstrate two Class 8 hydrogen fuel cell trucks with a 600-mile range and 25,000-hour durability.

In addition, the SuperTruck 3 program includes Ford Motor Company and General Motors, both of which will focus on smaller freight vehicles, up to Class 6 Super Duty trucks.

3. The NACFE Annual Fleet Fuel Study

The North American Council for Freight Efficiency (NACFE) (https://nacfe.org/) describes its mission as working to “drive the development and adoption of efficiency enhancing, environmentally beneficial, and cost-effective technologies, services and methodologies in the North American freight industry.”  

One of NACFE’s important products is the Annual Fleet Fuel Study, which reports on the adoption of 85 technologies and practices for improving freight efficiency among major North American Class 8 truck fleets operators.  The 2019 Annual Fleet Fuel Study was based on data from 21 fleets operating 73,844 tractors and 239,292 trailers.  You can download the NACFE 2019 Annual Fleet Fuel Survey here:  https://nacfe.org/annual-fleet-fuel-studies/

The following chart shows adoption rates among NACFE member fleets in seven technology categories.  Tractor aerodynamic improvements (light blue line) have a high rate of adoption, at about 62% in 2018.  In contrast, trailer aerodynamic improvements (purple line) have a much lower rate of adoption, at about 25% in 2018. 

Source: NACFE 2019 Annual Fleet Fuel Study

The Annual Fleet Fuel Study includes an analysis of the average fuel economy delivered by the combined Class 8 tractor-trailer fleet.  Over the 16 years of this study, the average year-on-year improvement in fuel economy has been 2.0%.  Fuel economy results are summarized in the following chart.

Source: NACFE 2019 Annual Fleet Fuel Study

Key points in this chart are:

  • The blue line represents the average fuel economy of the NACFE fleet from 2003 to 2018.  In 2018, the NACFE fleet-wide average fuel economy increased to 7.27 mpg.
  • The red line is a hypothetical “business as usual” case, which is an estimate of what NACFE fleet fuel economy would be based only on improvements in engine efficiency.  In 2018, “business as usual” would have yielded 6.37 mpg.
  • The difference between the blue and red curves represents the fuel efficiency improvements attributable to all other technologies and practices.  In 2018, that difference was 0.9 mpg, meaning that actual performance was 14% better than the “business as usual” case.
  • The lowest (purple) curve is based on actual data reported to the U.S. Department of Transportation’s Federal Highway Administration (FHWA) for the approximately 2.5 million over-the-road tractor-trailers operating in the US.  This average fleet fuel efficiency in 2017 was 5.98 mpg, well behind the fuel efficiency performance reported by NACFE fleet operators (which is included in the FHWA data). 

4.  Accessories available to improve the aerodynamic efficiency of existing tractor-trailers

The typical big rig has an aerodynamic drag coefficient, CD, of over 0.6, which has a huge effect on fuel economy, particularly during high-speed highway driving.  Many truck manufacturers and third-party firms offer add-on kits with a variety of devices that can be installed on an existing tractor-trailer to improve its aerodynamic efficiency.  Here we’ll look at a few of those devices:

  • Trailer tails (tapered boat-tails on the back of the trailer)
  • Trailer skirts
  • Aerodynamic wheel covers

The U.S. firm STEMCO (http://www.stemco.com) offers two aero kits for improving conventional tractor-trailer aerodynamics:  

  • TrailerTail®, which is installed at the back of the trailer, reduces the magnitude of the turbulent low-pressure area that forms behind the trailer at high speeds.
  • EcoSkirt®, which is installed under the trailer, reduces aerodynamic drag under the trailer where air hits the trailer’s rear axles. The side fairings streamline and guide the air around the sides and to the back of the trailer.

Both of these aerodynamic devices are shown in the following figure.     This was a tractor-trailer configuration that I saw frequently on I-90.

Source: STEMCO

STEMCO allocates the primary sources of tractor-trailer aerodynamic drag as shown in the following figure.

Source: STEMCO

STEMCO claims the following benefits from their aero kits:

  • “TrailerTail® fuel savings complement other aerodynamic technologies.”
  • “A TrailerTail® reduces aerodynamic drag by over 12% equating to over 5% fuel efficiency improvement at 65 mph (105 kph) and over 12% fuel efficiency improvement when combined with STEMCO’s side skirts and other minor trailer modifications.”

STEMCO TrailerTail® meets the SmartWay® advanced trailer end fairings criteria for a minimum of 5% fuel savings and the STEMCO EcoSkirt® meets the advanced trailer skirts qualifications with greater than 5% fuel savings. The payback period for these aero devices is expected to be about one year.

You’ll find more details on STEMCO’s tractor-trailer drag reduction products, including a short “Aerodynamics 101” video, at the following link:  http://www.stemco.com/aero-u/

More details on TrailerTail®, including its automatic deployment and operational use, are shown in a short video at the following link: https://www.youtube.com/watch?v=qPrM3-CCth8

Another firm, Aerotech Caps, offers a range of aero kits for improving truck aerodynamics, including aerodynamic wheel covers, aerodynamic trailer skirts, tail fairings and vortex generators.  You can see their product line at the following link:  https://aerotechcaps.com/#aerotechcaps

Source:  Aerotech Caps

Aerotech Caps claims that its aerodynamic wheel covers deliver about 2.4% increased miles per gallon when installed on rear tractor and all trailer wheels.  Payback period for this aero kit is expected to be about one year.

5.  Aerodynamic Class 8 production tractor-trailers and SuperTrucks from major US manufacturers

Conventional, top-of-the-line tractor-trailers on the market today have significantly improved aerodynamic and fuel efficiency performance in comparison to their predecessors.  The aero gains have been achieved by integrating many of the aero features described above into the basic designs for the latest Class 8 tractor-trailers on the market. In addition, optional aero kits are available to further improve performance.

Class 8 truck manufacturers’ market share in the U.S. as of December 2019 is shown in the following chart.

Source: Statista, 2020, https://www.statista.com/statistics/274937/market-share-of-truck-manufacturers-in-the-united-states/

Note that Freightliner is a Daimler North America brand along with Western Star.  Peterbilt and Kenworth are PACCAR brands.  International is a Navistar brand and Mack is a Volvo brand. 

Now we’ll take a look at the most aerodynamic tractor-trailers offered in 2020 by the top five manufacturers in the US Class 8 truck market. Collectively, these manufacturers account for almost 90% of the US Class 8 heavy truck market. 

Four of the five top manufacturers, Freightliner, Peterbilt, International and Volvo, led teams in the DOE SuperTruck 1 program (2010-2016) and are continuing their participation in the SuperTruck 2 program (2017 – 2022).  Kenworth did not participate in SuperTruck 1, but did participate in SuperTruck 2 as a member of a new team led by their parent firm, PACCAR.

You’ll find my articles on these tractor-trailers at the following links:

6.  Other advanced Class 8 tractor-trailer designs and test trucks

The future of heavy freight vehicles is certain to include increasingly aerodynamic tractor-trailers with more efficient diesel and hybrid powertrains. While the five teams participating in the DOE SuperTruck program are demonstrating significantly improved Class 8 tractor-trailer performance, other firms have been working in parallel to develop their own advanced truck concepts and test trucks. In this section, we’ll take a look at the following advanced integrated tractor-trailers. 

You’ll find my articles at these tractor-trailers at following links:

7.  Advanced electric-powered Class 8 tractor-trailers

A variety of electric-powered heavy trucks and tractor trailers are being developed for the worldwide market and several are being operationally tested.  The most common electric energy sources are be battery-electric or hydrogen fuel cell + battery. 

Regarding these two electric power sources, CleanTechnica reported (https://cleantechnica.com/2019/04/22/):

  • “Battery electric vehicles are around 90% efficient with the electricity that flows into the charger when it is converted into motion by the onboard motors.”
  •  “Hydrogen fuel cell vehicles are understandably less efficient, using the source electricity to break apart water, compress it, transfer it into the vehicle, and then convert the hydrogen back into electricity by combining it with ambient oxygen. Estimates for the efficiency of the electricity used to produce hydrogen, then get converted back to electricity in fuel cell vehicles, is around 40%.” 

Lithium-ion batteries currently are the dominant type of battery used in electric vehicles. Boston Consulting Group reported that one particular type, the lithium nickel-manganese-cobalt (NMC) battery, has good overall performance, excels on specific energy, has the lowest self-heating rate, and is a preferred candidate for electric vehicles.  For more information, see the 10 July 2019 Battery University article, “BU-205:  Types of Lithium-ion Batteries,” at the following link:  https://batteryuniversity.com/learn/article/types_of_lithium_ion

While less efficient in overall energy conversion, the hydrogen fuel cell weighs much less and can store much more energy than a comparably-sized, current-generation battery packaged for a heavy-duty truck application.  For more information on hydrogen fuel cells, see the May 2017 University of California (UC) Davis presentation, “Fuel Cells and Hydrogen in Long-Haul Trucks,” at the following link:  https://steps.ucdavis.edu/wp-content/uploads/2017/05/Andy-Burke-Hydrogen-Fuel-Cell-Trucks.pdf

In 2020, several heavy-duty electric truck designs are adaptations of existing Class 8 tractor-trailers with all-new electric powertrains.  Examples are shown in the following table.

Some designs in 2020 were “clean-sheet” advanced electric-powered Class 8 tractor-trailers that also may offer a future path toward autonomous vehicle operation.  Examples include:

Then there are even more advanced electric-powered heavy trucks that are designed originally as autonomous freight haulers without provisions for a driver’s cab.  For example:

You can get a good overview of the current state of electric-powered heavy truck development in the following October 2019 video by Automotive Territory:  “10 All-Electric Trucks and Freighters Showcasing the Future of Cargo Vehicles” (11:17 minutes):  https://www.youtube.com/watch?v=smAleMBEszs

In this section, we’ll take a look at the “clean-sheet” advanced electric-powered Class 8 tractor-trailers.  You’ll find my articles at these tractor-trailers at following links:

The DOE-sponsored SuperTruck 3 program initiated in 2022, which is funding work to develop battery-electric and fuel cell medium- and heavy-duty trucks and freight system solutions, is not funding any of the above three companies.

8. Conclusions:

Freight currently accounts for 9% of all U.S. greenhouse gas (GHG) emissions, and trucking is the dominant mode. The gradual phase-in of tractor-trailers with refined aerodynamics and diesel engines is improving fleet-wide fuel economy and thereby helping to decrease the carbon footprint of long-haul trucking.  

Large improvements in freight efficiency (the product of payload weight in tons and fuel economy in miles per gallon; ton-miles per gallon) were demonstrated during the DOE SuperTruck 1 program, and greater gains are expected in SuperTruck 2, which continued into 2023.  In the meantime, truck manufacturers are implementing SuperTruck technologies in their production model tractor-trailers.  This is a significant step in the right direction.

With the introduction of electric-powered tractor-trailers in the next decade, the trucking industry has an opportunity to revolutionize its operations by deploying fleets of zero-emission trucks.  The very aerodynamic, electric-powered Tesla Semi and the smaller freight vehicles being developed by Xos seem to be good first steps in starting the electric freight revolution. They will be joined by other electric-powered tractor-trailers and smaller freight vehicles being developed under the DOE SuperTruck 3 program, which will run thru 2027.

For the electric-powered trucks to compete effectively with diesel and hybrid-powered truck, the truck manufacturers and the freight industry needs to support deployment of the diverse nation-wide infrastructures for very-high capacity battery recharging and hydrogen refueling.  With these new infrastructures in place, electric-powered freight operations can become routine and make a big contribution to reducing GHG emissions and the environmental impact of the nation’s freight hauling industry.

In spite of all of these opportunities for improving heavy tractor-trailer performance, there always will be cases when few of these are actually practical.  As evidence, I offer the following photo taken at 80 mph on I-90 in South Dakota during my 2016 road trip.  How do you optimize that giant drag coefficient?

Source: Author photo

9.  For additional information:

General tractor-trailer aerodynamics

DOE SuperTruck 1 Program

DOE SuperTruck 2 Program (2017 to 2022)

DOE SuperTruck 3 Program (2022 to 2027)

Free Virtual Tours, Online Collections, and Other Free Resources to Explore on the Internet

Peter Lobner, Updated 9 March 2021

This post contains links to many free virtual tours and other online resources that may be of interest to you.  Also check out the long list of recommended external links on the introductory webpage for Pete’s Lynx, here:

https://lynceans.org/petes-lynx/

This is a great time to explore. Happy surfing!

1. Google Arts & Culture portal:

Here you’ll find virtual tours and online collections from many partner museums and other organizations.  So many, that I suggest that you try finding something of interest in the “A-Z” view.  There are 145 “A’s” and 8 “Z’s,” with more than 2,500 other museums and collections in between.  Start at the following link: https://artsandculture.google.com/partner

Also check out the Streetview tours of famous sites & landmarks here: https://artsandculture.google.com/project/street-view

2. MCN’s Ultimate Guide to Virtual Museum Resources, E-Learning, and Online Collections

On 14 March 2020, MCN (formerly the Museum Computer Network) posted “The Ultimate Guide to Virtual Museum Resources, E-Learning, and Online Collections,” at the following link:  http://mcn.edu/a-guide-to-virtual-museum-resources/

This is a very extensive list of free online resources and their links. MCN notes, “This list will be continually updated with examples of museum and museum-adjacent virtual awesomeness. It is by no means exhaustive….. Every resource is free to access and enjoy.”

3. Library of Congress (LOC)

The LOC has a wide range of digital collections that are easy to access here:  https://www.loc.gov/collections/

4.  Other museums & historic places:

Here are some additional virtual tours to supplement what you’ll find on the Google Arts & Culture portal and MCN’s extensive list of links.

5. Drone video collection:

6. Video and photographic tours:

While you’re browsing these, you’ll find many similar YouTube videos and photos from other sources on the sidebar of your screen.

7. TED Talks:

More than 3,300 talks to stir your curiosity:  https://www.ted.com/talks

8. Internet Archive:

Check out the Internet Archive, which is a non-profit library of millions of free books, movies, software, music, websites, and more.  The main website is here:  https://archive.org.  Direct links to some of the specific parts of the Internet Archive are here:

9. Open Culture: 

The best free cultural & educational media on the web, with more than 1,500 free online courses from top universities, 1,150 free movies, 700 free audio books, 800 free eBooks, 300 free language lessons, 15,000+ free Golden Age comics from the Digital Comic Museum, and more:  http://www.openculture.com/freeonlinecourses

Also visit these related websites:

10. Libraries: 

11. Maps & Globes:

12. Additional resources:

Other authors have provided similar information in the recent articles listed below.  Many of the museums listed in the following articles are accessible via the Google Arts & Culture portal.

U.S. Tritium Production Timelines

Peter Lobner

In the U.S., tritium for nuclear weapons was one of several products produced by the Atomic Energy Commission (AEC) and its successor, the Department of Energy (DOE), during the Cold War.  The machines for tritium production were water-cooled, graphite-moderated production reactors in Hanford, Washington, and heavy water cooled and moderated production reactors at the Savannah River Plant (SRP, now Savannah River Site, SRS) in South Carolina. Lithium “targets,” containing enriched lithium-6 produced at the Y-12 Plant in Oak Ridge Tennessee, were irradiated in these reactors to produce tritium.  Later, tritium was extracted from the targets, purified and packaged for use in nuclear weapons in separate facilities, initially at Hanford and Los Alamos and later at Savannah River.

Today, tritium for the U.S. nuclear weapons stockpile is produced in light water cooled and moderated commercial pressurized water reactors (PWRs) owned and operated by the Tennessee Valley Authority (TVA).  Tritium is extracted from the targets, purified and packaged for use in nuclear weapons at the Savannah River Site (SRS).

The following three timelines provide details on tritium production activities in the Cold War nuclear weapons complex:

The following timeline provides details on the post-Cold War nuclear weapons complex:

These timelines provide supporting information for my post, “U.S. tritium production for the nuclear weapons stockpile – not like the old days of the Cold War,” which is at the following link: https://lynceans.org/all-posts/u-s-tritium-production-for-the-nuclear-weapons-stockpile-not-like-the-old-days-of-the-cold-war/

U.S. Tritium Production for the Nuclear Weapons Stockpile – Not Like the Old Days of the Cold War

Updated 21 May 2020

Peter Lobner

1.  Introduction

Under the Manhattan Project and through the Cold War, the U.S. developed and operated a dedicated nuclear weapons complex that performed all of the functions needed to transform raw materials into complete nuclear weapons.  After the end of the Cold War (circa 1991), U.S. and Russian nuclear weapons stockpiles were greatly reduced.  In the U.S., the nuclear weapons complex contracted and atrophied, with some functions being discontinued as the associated facilities were retired without replacement, while other functions continued at a reduced level, many in aging facilities.

In its current state, the U.S. nuclear weapons complex is struggling to deliver an adequate supply of tritium to meet the needs specified by the National Nuclear Security Administration (NNSA) for “stockpile stewardship and maintenance,” or in other words, for keeping the nuclear weapons in the current, smaller stockpile safe and operational. Key issues include:

  • There have been no dedicated tritium production reactors operating since 1988.  Natural radioactive decay has been steadily reducing the existing inventory of tritium.
  • Commercial light water reactors (CLWRs) have been put into dual-use service since 2003 to produce tritium for NNSA while generating electric power that is sold commercially.  The current tritium production rate needs to increase significantly to meet needs.
  • There has been a continuing decline in the national inventory of “unobligated” (i.e., free from peaceful use obligations) low-enriched uranium (LEU) and high-enriched uranium (HEU). This unobligated uranium can be used for military purposes, such as fueling the dual-use tritium production reactors.
  • There has been no “unobligated” U.S. uranium enrichment capability since 2013.  The technology for a replacement enrichment facility has not yet been selected.
  • The U.S. domestic uranium production industry has declined to a small fraction of the capacity that existed from the mid-1950s to the mid-1980s.  About 10% of uranium purchases in 2018 were from U.S. suppliers, and 90% came from other countries. NNSA’s new enrichment facility will need a domestic source of natural uranium.  
  • There has been no operational lithium-6 production facility since the late 1980s. 
  • There has been a continuing decline in the national inventory of enriched lithium-6, which is irradiated in “targets” to produce tritium.
  • Only one tritium extraction facility exists.

The U.S. nuclear weapons complex for tritium production is relatively fragile, with several milestone dates within the next decade that must be met in order to reach and sustain the desired tritium production capacity.  There is little redundancy within this part of the nuclear weapons complex.  Hence, tritium production is potentially vulnerable to the loss of a single key facility.

This complex story is organized in this post as follows.  

  • Two key materials – Tritium and Lithium 
  • Cold War tritium production
    • Hanford Project P-10 (later renamed P-10-X) for tritium production (1949 to 1954)
    • Hanford N-Reactor Coproduct Program for tritium production (1963 to 1967)
    • Savannah River Plant tritium production (1954 to 1988)
    • Synopsis of U.S. Cold War tritium production
  • The Interregnum of U.S Tritium Production (1988 to 2003)
    • New Production Reactor (NPR) Program
    • Accelerator Tritium Production (ATP)
    • Tritium recycling
  • The U.S. commercial light water reactor (CLWR) tritium production program (2003 to present)
    • Structure of the CLWR program
    • What is a TPBAR?
    • Operational use of TPBARs in TVA reactors
    • Where will the uranium fuel for the TVA reactors come from?
    • Where will the enriched Lithium-6 come from?
    • Where is the tritium recovered?

I put supporting details in a separate post containing four timelines, which you’ll find at the following link: https://lynceans.org/all-posts/u-s-tritium-production-timelines/

2.  Two key materials – Tritium and Lithium

Tritium, or hydrogen-3, is naturally occurring in extremely small quantities (10-18 percent of naturally occurring hydrogen) or it can be artificially produced at great cost.  The current tritium price is reported to be about $30,000 per gram, making it the most expensive substance by weight in the world today. 

Tritium is a radioactive isotope of hydrogen with a half-life of 12.32 years.  Tritium decays into helium-3 by means of negative beta decay, which also produces an electron (e) and an electron antineutrino, as shown below.


Source: nuclear-power.net

Tritium is an important component of thermonuclear weapons.  The tritium is stored in a small, sealed reservoir in each warhead. 

A tritium reservoir, likely manufactured at the 
DOE Kansas City Plant.  Source: 7 Feb 2013,
https://aikenleader.villagesoup.com/

With its relatively short half-life, the tritium content of the reservoir is depleted at a rate of 5.5% per year and must be replenished periodically.  In 1999, DOE reported in DOE/EIS-0271 that none of the weapons in the U.S. nuclear arsenal would be capable of functioning as designed without tritium.

During the Cold War-era, the Atomic Energy Commission (AEC, and its successor in 1977, the Department of Energy, DOE) produced tritium for nuclear weapons in water-cooled, graphite-moderated production reactors in Hanford, Washington and in heavy water cooled and moderated production reactors at the Savannah River Plant (SRP, now Savannah River Site, SRS) in South Carolina.  These reactors also produced plutonium, polonium and other nuclear materials.  All of these production reactors were dedicated defense reactors except the dual-use Hanford-N reactor, which also could produce electricity for sale to the commercial power grid. 

Tritium is produced by neutron absorption in a lithium-6 atom, which splits to form an atom of tritium (T) and an atom of helium-4.  This process is shown below.

Natural lithium is composed of two stable isotopes; about 7.5% lithium-6 and 92.5% lithium-7. To improve tritium production, lithium-6 and lithium-7 are separated and the enriched lithium-6 is used to make “targets” that will be irradiated in nuclear reactors to produce tritium.  The separated, enriched lithium-7 is a valuable material for other nuclear applications because of its very low neutron cross-section.  Oak Ridge Materials Chemistry Division initiated work in 1949 to find a method to separate the lithium isotopes, with the primary goal of producing high purity lithium-7 for use in Aircraft Nuclear Propulsion (ANP) reactors.

Lithium-6 enrichment process development with a focus on tritium production began in 1950 at the Y-12 Plant in Oak Ridge, Tennessee. Three different enrichment processes would be developed with the goal of producing highly-enriched (30 to 95%) lithium-6:  electric exchange (ELEX), organic exchange (OREX) and column exchange (COLEX).  Pilot process lines (pilot plants) for all three processes were built and operated between 1951 and 1955.

Production-scale lithium-6 enrichment using the ELEX process was conducted at Y-12 from 1953 to 1956.  The more efficient COLEX process operated at Y-12 from 1955 to 1963.  By that time, a stockpile of enriched lithium-6 had been established at Oak Ridge, along with a stockpile of unprocessed natural lithium feed material.

The enriched lithium-6 material produced at Y-12 was shipped to manufacturing facilities at Hanford and Savannah River and incorporated into control rods and target elements that were inserted into a production reactor core and irradiated for a period of time.  

After irradiation, these control rods and target elements were removed from the reactor and processed to recover the tritium that was produced.  The recovered tritium was purified and then mixed with a specified amount of deuterium (hydrogen-2, 2H or D) before being loaded and sealed in reservoirs for nuclear weapons.  

Tritium production at Hanford ended in 1967 and at Savannah River in 1988.  The U.S. had no source of new tritium production for its nuclear weapons program between 1988 and 2003.  During that period, tritium recycling from retired weapons was the primary source of tritium for the weapons remaining in the active stockpile. Finally, in 2003, the nation’s new replacement source of tritium for nuclear weapons started coming on line.  

3.  Cold War Tritium Production

3.1  Hanford Project P-10 (later renamed P-10-X) for tritium production (1949 to 1954)

The industrial process for producing plutonium for WW II nuclear weapons was conceived and built as part of the Manhattan Project.  On 21 December 1942, the U.S. Army issued a contract to E. I. Du Pont de Nemours and Company (DuPont), stipulating that DuPont was in charge of designing, building and operating the future plutonium plant at a site still to be selected.  The Hanford, Washington, site was selected in mid-January 1943.

Starting in 1949, the earliest work involving tritium production by irradiation of lithium targets in nuclear reactors was performed at Hanford under Project P-10 (later renamed P-10-X).  By this time, DuPont had built and was operating four water-cooled, graphite-moderated production reactors at Hanford:  B and D Reactors (1944), F Reactor (1945) and H Reactor (1949).  Project P-10-X involved only the B and H Reactors, which were modified for tritium production. 

Tritium was recovered from the targets in Building 108-B, which housed the first operational tritium extraction process line in the AEC’s nuclear weapons complex.  The thermal extraction process employed started with melting the target material in a vacuum furnace and then collecting and purifying the tritium drawn off in the vacuum line.  This tritium product was sent to Los Alamos for further processing and use.  

Hanford site 100-B area.  B Reactor is the tiered building near the center of the photo. The much smaller 108-B tritium extraction process line building is sitting alone on the right.  Source: atomicarchive.com

Project P-10-X provided the initial U.S. tritium production capability from 1949 to 1954 and supplied the tritium for the first U.S. test of a thermonuclear device, Ivy Mike, in November 1952.  Thereafter, most tritium production and all tritium extractions were accomplished at the Savannah River Plant.  

DOE reported: “During its five years of operation, Project P-10-X extracted more than 11 million Curies (Ci) of tritium representing a delivered amount of product of about 1.2 kg.”  For more details, see the report PNNL-15829, Appendix D:  “Tritium Inventories Associated with Tritium Production,” which is available here: 

https://www.pnnl.gov/main/publications/external/technical_reports/PNNL-15829rev0.pdf

3.2.  Hanford N-Reactor Coproduct Program for tritium production (1963 to 1967)

This was a tritium production technology development program conducted in the mid-1960s.  Its primary aim was not to produce tritium for the U.S. nuclear weapons program, but rather to develop technologies and materials that could be applied in tritium breeding blankets in fusion reactors.  After an extensive review of candidate lithium-bearing target materials, the high melting point ceramic lithium aluminate (LiAlO2) was chosen.

Several fuel-target element designs were tested in-reactor, culminating in October 1965 with the selection of the “Mark II” design for use in the full-reactor demonstration.  Targets were double-clad cylindrical elements with a lithium aluminate core. The first cladding layer was 8001 aluminum; the second (outer) cladding layer was Zircaloy-2.

Hanford N Coproduct Target Element.  Source:  BNWL-2097

During the N Reactor coproduct demonstration, four distinct production tests were run, the first two with small numbers of fuel and target columns being irradiated, and the last two runs with over 1,500 fuel and target columns containing about 17 tons LiAlO2.  The last production test, PT-NR-87, recorded the highest N Reactor power level by operating at 4,800 MWt for 31 hours.

The irradiated target elements were shipped to SRP for tritium extraction using a thermal extraction process defined jointly by Pacific Northwest Laboratory (PNL, now Pacific Northwest National Laboratory, PNNL) and Savannah River Laboratories (SRL).  The existing tritium extraction vacuum furnaces at SRP were used.

This completed the Hanford N Reactor Coproduct Program.

More details are available in PNNL report BNWL-2097, “Tritium Production from Ceramic Targets: A Summary of the Hanford Coproduct Program,” which is available at the following link:  

https://www.osti.gov/servlets/purl/7125831

This program provided important experience related to lithium aluminate ceramic targets for tritium production. 

3.3.  Savannah River Plant tritium production (1954 to 1988)

The Savannah River Plant (SRP) was designed in 1950 primarily for a military mission to produce tritium, and secondarily to produce plutonium and other special nuclear materials, including Pu-238.  DuPont built five dedicated production reactors at the SRP and became operational between 1953 and 1955: the R reactor (prototype) and the later P, L, K and C reactors.  

In 1955, the original maximum power of C Reactor was 378 MWt.  With ongoing reactor and system improvements, C Reactor was operating at 2,575 MWt in 1960, and eventually was rated for a peak power of 2,915 MWt in 1967.  The other SRP production reactors received similar reactor and system improvements.  The increased reactor power levels greatly increased the tritium production capacity at SRP.  You’ll find SRP reactor operating power history charts in Chapter 2 of “The Savannah River Site Dose Reconstruction Project -Phase II,” report at the following link:  

https://www.cdc.gov/nceh/radiation/savannah/Chapter_02.pdf

Enriched lithium-6 product was sent from the Oak Ridge Y-12 Plant to SRP Building 320-M, where it was alloyed with aluminum, cast into billets, extruded to the proper diameter, cut to the required length, canned in aluminum and assembled into control rods or “driver” fuel elements.From 1953 to 1955, tritium was produced only in control rods. Lithium-aluminum alloy target rods (“producer rods”) were installed in the septifoil (7-chambered) aluminum control rods in combination with cadmium neutron poison rods to get the desired reactivity control characteristics.

Cross-section of a septifoil control rod.  Source:
The Savannah River Site at Fifty (1950 – 2000), Chapter 13

Starting in 1955, enriched uranium “driver” fuel cylinders and lithium target “slugs” were assembled in a quatrefoil (4-chambered) configuration, which provided much more target mass in the core for tritium production.

Cross-section of a quatrefoil driver fuel / target element. Source:
The Savannah River Site at Fifty (1950 – 2000), Chapter 13
 

Enriched uranium drivers were extruded in Building 320-M until 1957, after which they were produced in the newly constructed Building 321-M.  Production rate varied with the needs of the reactors, peaking in 1983, when the operations in Building 321-M went to 24 hours a day. Manufacturing ceased in 1989 after the last production reactors, K, L and P, were shut down.

K Reactor was operated briefly, and for the last time, in 1992 when it was connected to a new cooling tower that was built in anticipation of continued reactor operation.  K Reactor was placed in cold-standby in 1993, but with no planned provision for restart as the nation’s last remaining source of new tritium production.  In 1996, K Reactor was permanently shut down.

3.4.  Synopsis of U.S. Cold War tritium production

The Federation of American Scientists (FAS) estimated that the total U.S. tritium production (uncorrected for radioactive decay) through 1984 was about 179 kg (about 396 pounds). 

  • DOE reported a total of 10.6 kg (23.4 pounds) of tritium was produced at Hanford:
    • About 1.2 kg (2.7 pounds) was produced at the B and H Reactors during Project P-10-X.
    • The balance of Hanford production (9.4 kg, 20.7 pounds) is attributed to N Reactor operation during the Coproduct Program.  
  • The majority of U.S. tritium production through 1984 occurred at the Savannah River Plant: about 168.4 kg (371.3 pounds).

You can read the FAS tritium inventory report here: https://fas.org/nuke/norris/nuc_87010103d_65c.pdf

4.  The Interregnum of U.S Tritium Production (1988 – 2003)

DOE had shut down all of its Cold War-era production reactors.  Tritium production at Hanford ended in 1967 and at Savannah River in 1988, leaving the U.S. temporarily with no source of new tritium for its nuclear weapons program.  At the time, nobody thought that “temporary” meant 15 years (a period I call the “Interregnum”).  

DOE’s search for new production capacity focused on four different reactor technologies and one particle accelerator technology.  During the Interregnum, the primary source of tritium was from recycling tritium reservoirs from nuclear weapons that had been retired from the stockpile.  This worked well at first, but tritium decays.

4.1 New Production Reactor (NPR) Program

From 1988 to 1992, DOE conducted the New Production Reactor (NPR) Program to evaluate four candidate technologies for a new generation of production reactors that were optimized for tritium production, but with the option to produce plutonium:

  • Heavy water cooled and moderated reactor (HWR)
  • High-temperature gas-cooled reactor (HTGR)
  • Light water cooled and moderated reactor (LWR)
  • Liquid metal reactor (LMR)

Three candidate NPR sites were considered:

  • Savannah River Site
  • Idaho National Engineering Laboratory (INEL, now INL)
  • Hanford Site

The NPR schedule goal was to have the new reactors start tritium production within 10 years after the start of conceptual design.  Details on this program are available in DOE/NP-0007P, “New Production Reactors – Program Plan,” dated December 1990, which is available here:  https://www.osti.gov/servlets/purl/6320732

The NPR program was cancelled in September 1992 (some say “deferred”) after DOE failed to select a preferred technology and failed to gain Congressional budgetary support for the program, at least in part due to the end of the Cold War. 

DOE continued evaluating other options for tritium production, including commercial light water reactors (CLWRs) and accelerator tritium production (ATP).

4.2  Accelerator Tritium Production (ATP)

A candidate ATP design developed by Los Alamos National Laboratory (LANL) was based on a 1,700 MeV (million electron volt) linear accelerator that produced a 170 MW / 100 mA continuous proton beam.  The ATP total electric power requirement was 486 MWe.  The general arrangement of the ATP is shown in the following diagrams.


General arrangement of the ATP.  Source:  LANL

In this diagram, beam energy is indicated along the linear accelerator, increasing to the right and reaching a maximum of 1,700 MeV just before entering a magnetic switch that diverts the beam to the target/blanket or allows to beam to continue straight ahead to a tuning backstop.

Details of the Target / Blanket System.  Source:  LANL

The Target / Blanket System operates as follows:

  • The continuous proton beam is directed onto a tungsten target surrounded by a lead blanket, generating a huge flux of spallation neutrons.
  • Tubes filled with Helium-3 gas are located adjacent to the tungsten and within the lead blanket. 
  • The spallation neutrons created by the energetic protons are moderated by the lead and cooling water and are absorbed by Helium-3 to create about 40 tritium atoms per incident proton.
  • The tritium is continuously removed from the Helium-3 gas in a nearby Tritium Separation Facility. 

The unique feature of on-line, continuous tritium collection eliminates the time and processing required to extract tritium from the target elements used in production reactors.

ATP ultimately was rejected by DOE in December 1998 in favor of producing tritium in a commercial light water reactor (CLWR).

You’ll find an overview of the 1992 to 1998 ATP program here:  http://accelconf.web.cern.ch/AccelConf/pac97/papers/pdf/9B003.PDF

4.3  Tritium recycling

After the end of the Cold War, both the U.S. and Russia greatly reduced their respective stockpiles of nuclear weapons, as shown in the following chart.

Source:  Wikipedia

The decommissioning of many nuclear weapons created an opportunity for the U.S. to temporarily maintain an adequate supply of tritium by recycling the tritium from the reservoirs no longer needed in warheads being retired from service.  However, by 2020, after 32 years of exponential decay at a rate of 5.5% per year, the 1988 U.S. tritium inventory had decayed to only about 17% of the inventory in 1988, when the DOE stopped producing tritium.  You can check my math using the following exponential decay formula:

y = a (1-b)x

where:

y =    the fractional amount remaining after x periods

a =    initial amount = 1

b =    the decay rate per period (per year) = 0.055

x =     number of periods (years) = 32

Recycling tritium from retired and aged reservoirs and precisely reloading reservoirs for installation in existing nuclear weapons are among the important functions performed today at DOE’s Savannah River Site (SRS).  But, clearly, there is a point in time where simply recycling tritium reservoirs is no longer an adequate strategy for maintaining the current U.S. stockpile of nuclear weapons.  A source of new tritium for military use was required.

5.  The U.S. commercial light water reactor (CLWR) tritium production program (2003 to present)

In December 1998, Secretary of Energy Bill Richardson announced the decision to select commercial light water reactors (CLWRs) as the primary tritium supply technology, using government-owned Tennessee Valley Authority (TVA) reactors for irradiation services.  A key commitment made by DOE was that the reactors would be required to use U.S.-origin low-enriched uranium (LEU) fuel.  In their September 2018 report R45406, the Congressional Research Service noted: “Long-standing U.S. policy has sought to separate domestic nuclear power plants from the U.S. nuclear weapons program – this is not only an element of U.S. nuclear nonproliferation policy but also a result of foreign ‘peaceful-use obligations’ that constrain the use of foreign-origin nuclear materials.”

5.1  Structure of the CLWR program

The current U.S. CLWR tritium production capability was deployed in about 12 years, between 1995 and 2007, as shown in the following high-level program plan.

CLWR tritium production program plan.
Source: adapted from NNSA 2001

Since early 2007, NNSA has been getting its new tritium supply for nuclear stockpile maintenance from tritium-producing burnable absorber rods (TPBARs) that have been irradiated in the slightly-modified core of TVA’s Watts Bar Unit 1 (WBN 1) nuclear power plant, which is a Westinghouse commercial pressurized water reactor (PWR) licensed by the U.S. Nuclear Regulatory Commission (NRC).  

TVA’s Watts Bar nuclear power plant.
Source: Oak Ridge Today, 13 Feb 2019

The NRC’s June 2005 “Backgrounder” entitled, “Tritium Production,” provides a good synopsis of the development and nuclear licensing work that led to the approval of TVA nuclear power plants Watts Bar Unit 1 and Sequoyah Units 1 and 2 for use as irradiation sources for tritium production for NNSA.  You find the NRC Backgrounder here:

https://www.nrc.gov/docs/ML0325/ML032521359.pdf

The CLWR tritium production cycle is shown in the following NNSA diagram.  Not included in this diagram are the following:

  • Supply of U.S.-origin LEU for the fuel elements.
  • Production of fuel elements using this LEU
  • Management of irradiated fuel elements at the TVA reactor sites
The current U.S. tritium production cycle.  
Source:  NNSA and Art Explosion via GAO-11-100

PNNL is the TPBAR design authority (agent) and is responsible for coordinating irradiation testing of TPBAR components in the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL).  Production TPBAR components are manufactured by several contractors in accordance with specifications from PNNL, with WesDyne International responsible for assembling the complete TPBARs in Columbia, South Carolina.  When needed, new TPBARs are shipped to TVA for installation in a designated reactor during a scheduled refueling outage and then irradiated for 18 months, until the next refueling outage.  After being removed from the reactor, the irradiated TPBARs are allowed to cool at the TVA nuclear power plant for a period of time and then are shipped to the Savannah River Site.  

SRS is the only facility in the nuclear security complex that has the capability to extract, recycle, purify, and reload tritium.  Today, the Savannah River Tritium Enterprise (SRTE) is the collective term for the facilities, people, expertise, and activities at the SRS related to tritium production.  SRTE is responsible for extracting new tritium from irradiated TPBARs at the Tritium Extraction Facility (TEF) that became operational in January 2007. They also are responsible for recycling tritium from reservoirs of existing warheads.  The existing Tritium Loading Facility at SRS packages the tritium in sealed reservoirs for delivery to DoD.  You’ll find the SRTE fact sheet at the following link:

https://www.srs.gov/general/news/factsheets/srs_srte.pdf

Program participants and their respective roles are identified in the following diagram.

The current U.S. tritium production program participants.  
Source:  NNSA 2001

5.2  What is a TPBAR?

The reactor core in a Westinghouse commercial four-loop PWR like Watts Bar Unit 1 approximates a right circular cylinder with an active core measuring about 14 feet (4.3 meters) tall and 11.1 feet (3.4 meters) in diameter.  The reactor core has 193 fuel elements, each of which is comprised of a 17 x 17 square array of 264 small-diameter, fixed fuel rods and 25 small-diameter empty thimbles, 24 of which serve as guide thimbles for control rods and one is an instrumentation thimble. 

Rod cluster control assemblies (RCCAs) are used to control the reactor by moving arrays of small-diameter neutron-absorbing control rods into or out of selected fuel elements in the reactor core.  Watts Bar has 57 RCCAs, each comprised of 24 Ag-In-Cd (silver-indium-cadmium) neutron-absorbing rods that fit into the control rod guide thimbles in selected fuel elements. Each RCCA is controlled by a separate control rod drive mechanism.  The geometries of a Westinghouse 17 x 17 fuel element and the RCCA are shown in the following diagrams.


Cross-sectional view of a single Westinghouse 17 x 17 fuel element showing the lattice positions assigned to fuel rods (red) and the thimbles available for instrumentation and control rods (blue). Source:  Syeilendra Pramuditya

Isometric view of a Westinghouse 17 x 17 fuel element showing the fixed fuel rods (red) and a rod cluster control assembly (yellow) that can be inserted or withdrawn for reactivity control.  Sources:  (L) Framatom ANP report BAW-10237, May 2001; 
(R) Westinghouse via NuclearTourist

To produce tritium in a Westinghouse PWR core, lithium-6 targets, in the form of lithium aluminate (LiAlO2) ceramic pellets, are inserted into the core and irradiated.  This is accomplished with the tritium-producing burnable absorber rods (TPBARs), each of which is a small-diameter rod (a “rodlet”) that externally looks quite similar to a single control rod in an RCCA.  During one typical 18-month refueling cycle (actually, up to 550 equivalent full power days), the tritium production per rod is expected to be in a range from 0.15 to 1.2 grams. The ceramic lithium aluminate target is similar to the targets developed in the mid-1960s and used during the Hanford N-Reactor Coproduct Program for tritium production.

A TPBAR “feed batch” assembly generally resembles the shape of an RCCA, but with 12 or 24 TPBAR rodlets in place of the control rods.  The feed batch assembly is a hanging structure supported by the top nozzle adapter plate of the fuel assembly and the TPBAR rodlets are hanging in the guide thimble tubes of the fuel assembly.  The feed batch assembly does not move after it has been installed in the reactor core. 

Since lithium-6 is a strong neutron absorber, the TPBAR functions in the reactor core in a manner similar to fixed burnable absorber rods, which use boron-10 as their neutron absorber.  The reactivity worth of the TPBARs is slightly greater than the burnable absorber rods.

In 2001, Framatome ANP issued Report BAW-10237,  “Implementation and Utilization of Tritium Producing Burnable Absorber Rods (TPBARS) in Sequoyah Units 1 and 2.”   This report provides a good description of the modified core and TPBARs as they would be applied for tritium production at the Sequoyah nuclear plant. Watts Bar should be similar.  The report is here: 

http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.388.7747&rep=rep1&type=pdf

The feed batch assembly and TPBAR rodlet configurations are shown in the following diagram.

TPBAR feed batch assembly (left); details of an 
individual TPBAR and target pellet (right).  Source:  NNSA 2001

TPBARs were designed for a low rate of tritium permeation from the target pellets, through the cladding and into the primary coolant water.  Tritium permeation performance was expected to be less than 1.0 Curie/one TPBAR rod/year.  With an assumed  maximum of 2,304 TPBARs in the reactor core, the NRC initially licensed Watts Bar Unit 1 for a maximum annual tritium permeation of 2,304 Curies / year.

5.3. Operational use of TPBARs in TVA reactors

NRC issued WBN 1 License Amendment 40 in September 2002,  approving the irradiation of up to 2,304 TPBARs per operating cycle.

For the first irradiation cycle (Cycle 6) starting in the autumn of 2003, TVA received NRC approval to operate with only 240 TPBARs because of issues related to Reactor Coolant System (RCS) boron concentration.  Actual TPBAR performance during Cycle 6 demonstrated a significantly higher rate of tritium permeation than expected; reported to be about 4.0 Curies/one TPBAR/cycle.

TVA’s short-term response was to limit the number of TPBARs per core load to 240 in Cycles 7 and 8 to ensure compliance with its NRC license limits on tritium release. In their 30 January 2015 letter to TVA, NRC stated, “….the primary constraint on the number of TPBARs in the core is the TPBAR tritium release per year of 2,304 Curies per year.”  This guidance gave TVA some flexibility on the actual number of TPBARs that could be irradiated per cycle.  This NRC letter is available here: https://www.nrc.gov/docs/ML1503/ML15030A508.pdf

PNNL’s examinations of TPBARs revealed no design or production flaws.  Nonetheless, PNNL developed design modifications intended to improve tritium permeation performance.  These changes were implemented by the manufacturing contractors, resulting in the Mark 9.2 TPBAR, which was first used in 2008 in WBN 1 Cycle 9. PNNL also is conducting an ongoing irradiation testing programs in the Advanced Test Reactor (ATR) at INL, with the goal of finding a technical solution for the high permeation rate. You’ll find details on this program in a 2013 PNNL presentation at the following link:  https://www.energy.gov/sites/prod/files/2015/08/f26/Senor%20-%20TMIST-3%20Irradiation%20Experiment.pdf

In October 2010, the General Accounting Office (GAO) reported: “no discernable improvement in TPBAR performance was made and tritium is still permeating from the TPBARs at higher-than-expected rates.”  This GAO report is available here:  https://www.gao.gov/products/GAO-11-100

In response to the high tritium permeation rate, the irradiation management strategy was revised based on an assumed permeation rate of 5.0 Curies per TPBAR per year (five times the original expected rate). Even at this higher permeation rate, WBN 1 can meet the NRC requirements in 10 CFR Part 20 and 10 CFR Part 50 Appendix I related to controlling radioactive materials in gaseous and liquid effluents produced during normal conditions, including expected occurrences.

The many NRC license amendments associated with WBN 1 tritium production are summarized below:

  • In License Amendment 40 (Sep 2002), the NRC originally approved WBN 1 to operate with up to 2,304 TPBARs.
  • Cycle 6:  TVA limited the maximum number of TPBARs to be irradiated to 240 based on issues related to Reactor Coolant System (RCS) boron concentration.  Approved by NRC in WBN 1 License Amendment 48 (Oct 2003).
  • Cycles 7 & 8:  WBN 1 continued operating with 240 TPBARs.
  • Cycle 9: First use of TPBARs Mark 9.2 supported TVAs request to increase the maximum number of TPBARs to 400.  Approved by NRC in WBN 1 License Amendment 67 (Jan 2008)
  • Cycle 10: TVA reduced the number of TPBARs irradiated to 240 after discovering that the Mark 9.2 TPBAR design changes deployed in Cycle 9 did not significantly reduce tritium permeation.
  • Cycles 11 to 14: NRC License Amendment 77 9May 2009) allowed a maximum of 704 TPBARs at WBN 1.  TVA chose to irradiate only 544 TPBARs in Cycles 11 and 12, increasing to 704 TPBARs for Cycles 13 & 14.
  • Cycles 15 & beyond:  NRC License Amendment 107 (Aug 2016) allows a maximum of 1,792 TPBARs at WBN 1.

The actual number of TPBARs and the average tritium production per TPBAR during WBN 1 Cycles 6 to 14 are summarized in the 2017 PNNL presentation, “Tritium Production Assurance,” and are reproduced in the following table.

Tritium production, WBN 1 Cycles 6 to 14 (Cycle 14, completed in 2011, is an estimate).  Source: PNNL, Tritium Production Assurance, 11 May 2017

The current tritium production plan continues irradiation in WBN 1 and starts irradiation in Watts Bar Unit 2 (WBN 2) in Cycle 4, which will start after the spring 2022 refueling.  Tritium is assumed to be delivered six months after the end of each cycle.

WBN 1 and WBN 2 TPBAR loading plans. 
Source: “Tritium Production Assurance”, report of the PNNL Tritium Focus Group, Richland, WA, May 11, 2017

See the complete PNNL presentation, “Tritium Production Assurance,” here: https://www.energy.gov/sites/prod/files/2017/06/f34/May%2011%20-%20Stewart%20-%20Tritium%20Production%20Assurance.pdf

As of early 2020, TVA and DOE are not delivering the quantity of tritium expected by NNSA. In July 2019, DOE and NNSA delivered their “Fiscal Year 2020 – Stockpile Stewardship and Management Plan” to Congress.  In this plan, the top-level goal was to “recapitalize existing infrastructure to implement a plan to produce no less than 80 ppy (plutonium pits per year) by 2030.” To meet this goal, NNSA set a target for increasing tritium production to 2,800 grams per two 18-month reactor cycles of production at TVA by 2027. This means two TVA reactors will be producing tritium, and each will have a target of about 1,400 grams per cycle.  This will be quite a challenge for TVA and DOE.

The 2018 Stockpile Stewardship and Management Plan is available here: https://www.energy.gov/sites/prod/files/2018/10/f57/FY2019%20SSMP.pdf

5.4  Where will the uranium fuel for the TVA reactors come from?

The tritium-producing TVA reactors are committed to using unobligated LEU fuel.  That means that the uranium is not encumbered by international obligations that restrict its use for peaceful purposes only. Unobligated uranium has a very special pedigree. The uranium originated from U.S. mines, was processed in U.S. facilities, and was enriched in an unobligated U.S. enrichment facility.  

Today, that front-end of the U.S. nuclear fuel cycle has withered against international competition, as shown in the following chart from the Energy Information Administration (EIA).

Source:  EIA, https://www.eia.gov/energyexplained/nuclear/where-our-uranium-comes-from.php

Since the U.S. has not had an unobligated uranium enrichment facility since 2013, when the Paducah enrichment plant was closed by the Obama administration, there currently is no source of new unobligated LEU for the tritium-producing TVA reactors.

The impending shortage of unobligated enriched uranium eventually could affect tritium production, Navy nuclear reactor operation and other users. This matter has been addressed by the GAO in their 2018 report GAO-18-126, “NNSA Should Clarify Long-Term Uranium Enrichment Mission Needs and Improve Technology Cost Estimates,” which is available here:

https://www.gao.gov/assets/700/690143.pdf

The solution could be a mixture of measures, some of which are discussed briefly below.  

Downblend unobligated HEU to buy time

Currently, the LEU for the TVA reactors is supplied from the U.S. inventory of unobligated LEU, which is supplemented by downblending unobligated HEU.  In September 2018, NNSA awarded Nuclear Fuel Services (NFS) a $505 million contract to downblend 20.2 metric tons of HEU to produce LEU, which can serve as a short-term source of fuel for the tritium-producing TVA reactors.  This contract runs from 2019 to 2025.  Beyond 2025, additional HEU downblending may be needed to sustain tritium production until a longer-term solution is in place.

Build a new unobligated uranium enrichment facility and re-build the associated domestic uranium mining, milling and conversion infrastructure

NNSA is in the process of selecting the preferred technology for a new unobligated enrichment plant.  There are two competing enrichment technologies:  the Centrus AC-100 large advanced gas centrifuge and the Oak Ridge National Laboratory small advanced gas centrifuge, both of which are designed to enrich gaseous uranium hexafluoride (UF6).

NNSA failed to meet its goal of making the selection by the end of 2019.  Regardless of the choice, it will take more than a decade to deploy such a facility.  Perhaps a mid-2030’s date would be a possible target for initial operation of a new DOE uranium enrichment facility.

In the meantime, the atrophied / shutdown US uranium mining, milling and conversion industries need to be rebuilt to once again establish a reliable, domestic source of feed material for DOE’s uranium enrichment operations.  This will be a daunting task given the current sad state of the US uranium production industry.

In May 2020, the US Energy Information Administration (EIA) released its 2019 Domestic Uranium Production Report.  Mining uranium ore or in-situ leaching from underground uranium ore bodies, followed by the production of uranium (U3O8) concentrate (”yellowcake”), are the first steps at the front-end of the nuclear fuel cycle.  The following EIA summary graphic shows the decline of US uranium production, which has been especially dramatic since 2013.

US uranium (U3O8) concentrate production and shipments, 
1996–2019. Source: EIA

A key point reported by the EIA was that total US production of uranium concentrate from all domestic sources in 2019 was only 170,000 pounds (77,111 kg) of U3O8, 89% less than in 2018, from six facilities.  In the graphic, you can see that US annual production in 1996 was about 35 times greater, approximately 6,000,000 pounds (2,721,554 kg).  This EIA report is available at the following link: https://www.eia.gov/uranium/production/annual/

Conversion of U3O8 to UF6 is the next step in the front-end of the nuclear fuel cycle.  Honeywell’s Metropolis Works was built in 1958 to produce UF6 for US government programs, including the nuclear weapons complex.  Therefore, the Metropolis Works should be an unobligated conversion plant and, as such, is an important facility in the nuclear fuel cycle for the US tritium production reactors operated by TVA.  In 2020, the Metropolis Works is the only US facility that can receives uranium ore concentrate and convert it to UF6.

In 1968, Metropolis Works began selling UF6 on the commercial nuclear market. However, since 2017, operations at the Metropolis Works have been curtailed due to weak market conditions for its conversion services and Honeywell has maintained the facility in a “ready-idle” status. In March 2020, the NRC granted the Metropolis Works a 40-year license renewal, permitting operations until March 24, 2060.  When demand resumes, the Metropolis Works should be ready to resume operation.

Recognizing the US national interest in having a viable industrial base for the front-end of the nuclear fuel cycle, President Trump established a Nuclear Fuel Working Group in July 2019.  On 13 April, 2020, the DOE released the “Strategy to Restore American Nuclear Energy Leadership,” which, among other things, includes recommendations to strengthen the US uranium mining and conversion industries and restore the viability of the entire front-end of the nuclear fuel cycle.  You’ll find this DOE announcement and a link to the full report to the President here: https://www.energy.gov/articles/secretary-brouillette-announces-nuclear-fuel-working-groups-strategy-restore-american

Reprocess enriched DOE and naval fuel spent fuel

A large inventory of aluminum clad irradiated fuel exists at SRS, with a smaller quantity at INL.  The only operating chemical separations (reprocessing) facility in the U.S. is the H-Canyon facility at SRS, which can only process aluminum clad fuel.  However, the cost to operate H-Canyon to process the aluminum-clad fuel would be high.

There is a large inventory of irradiated, zirconium-clad naval fuel at INL.  This fuel started life with a uranium enrichment level of 93% or higher.  In 2017, INL completed a study examining the feasibility of processing zirconium-clad spent fuel through a new process called ZIRCEX. This process could enable reprocessing the spent naval fuel stored at INL as well as other types of zirconium-clad fuel.

In 2018, the U.S. Senate approved $15 million in funding for a pilot program at the INL to “recycle” irradiated (used) naval nuclear fuel and produce high-assay, low-enriched uranium (HALEU) fuel with an enrichment between 5% to 20% for use in “advanced reactors.”  It seems that a logical extension would be to also produce LEU fuel to a specification that could be used in the TVA reactors.

In 2018, Idaho Senator Mike Crapo made the following report to the Senate:  “HEU repurposing, from materials like spent naval fuel, can be done using hybrid processes that use advanced dry head-end technologies followed by material recovery, which creates the fuel for our new advanced reactors. Repurposing this spent fuel has the potential of reducing waste that would otherwise be disposed of at taxpayer expense, and approximately 1 metric ton of HEU can create 4 useable tons (of HALEU) for our new reactors.”

Perhaps there is a future for closing the back-end of the naval fuel cycle and recovering some of the investment that went into producing the very highly enriched uranium used in naval reactors.  Because of the high burnup in long-life naval reactors, the resulting HALEU or LEU will have different uranium isotopic proportions than LEU produced in the front-end of the fuel cycle.  This may introduce issues that would have to be reviewed and approved by the NRC before such LEU fuel could be used in the TVA reactors.

Other options

More information on options for obtaining enriched uranium without acquiring a new uranium enrichment facility is provided in Appendix II of GAO-18-126.

5.5  Where will the enriched lithium-6 target material come from?

A reliable source of lithium-6 target material is needed to produce the TPBARs for TVA’s tritium-producing reactors.  

The U.S. has not had an operational lithium-6 production facility since 1963 when the last COLEX (column exchange) enrichment line was shutdown.  COLEX was one of three lithium enrichment technologies employed at the Y-12 Plant in Oak Ridge, TN between 1950 and 1963.  The others technologies were ELEX (electrical exchange) and OREX (organic exchange).  All of these processes used large quantities of mercury.  At the time lithium-6 enrichment operations ceased at Y-12, a stockpile of enriched lithium-6 and lithium-7 had been established along with a stockpile of unprocessed natural lithium feed material.

There has been a continuing decline in the national inventory of enriched lithium-6.  To extend the existing supply, NNSA has instituted a program to recover and recycle lithium components from nuclear weapons that are being retired from the stockpile.

In May 2017, Y-12 lithium activities were adversely affected by the poor physical condition (and partial roof collapse) of the WW II-vintage Building 9204-2 (Beta 2).  

Shortly thereafter, NNSA announced the approval of plans for a new Lithium Production Facility at Y-12 to replace Building 9204-2.  The NNSA’s Fiscal Year 2020 – Stockpile Stewardship and Management Plan set an operational date of 2030 for the new facility.

5.6  Where is the tritium recovered?

Tritium is extracted from the irradiated TPBARs, purified and loaded into reservoirs at the Savannah River Site (SRS).  These functions are performed by “Savannah River Tritium Enterprise” (SRTE), which is the collective term for the tritium facilities, people, expertise, and activities at the SRS.

The first load of irradiated TPBARs were consolidated at Watts Bar and delivered to SRS in August 2005 for storage pending completion of the new Tritium Extraction Facility (TEF).  The TEF became fully operational and started extracting tritium from TPBARs in January 2007.  The tritium extracted at TEF is transferred to the H Area New Manufacturing (HANM) Facility for purification. In February 2007, the first newly-produced tritium was delivered to the SRS Tritium Loading Facility for loading into reservoirs for nuclear weapons.

From 2007 until 2017, the TEF conducted only a single extraction each year because of the limited quantities of TPBARs being irradiated in the TVA reactors. During this period, the TEF sat idle for nine months each year between extraction cycles.

In 2017, for the first time, the TEF performed three extractions in a single year using the original vacuum furnace. Each extraction typically involved 300 TPBARs.

In November 2019, SRTE’s capacity for processing TPBARs and recovering tritium was increased by the addition of a second vacuum furnace.

6.  Conclusions

In their “Fiscal Year 2020 – Stockpile Stewardship and Management Plan,”  the NNSA’s top-level goal is to “recapitalize existing infrastructure to implement a plan to produce no less than 80 ppy (plutonium pits per year) by 2030.”  This goal will drive tritium production demand, which in turn will drive demands for unobligated LEU to fuel TVA’s tritium-producing reactors and enriched lithium-6 for TPBARs.

The U.S. nuclear fuel cycle for the production of tritium currently is incomplete.  It is able to produce tritium by using temporary measures that are not sustainable:

  • Downblending HEU to produce LEU
  • Recycling tritium as the primary means for meeting current demand
  • Recycling lithium components

The next 15 years will be quite a challenge for the NNSA, DOE and TVA as they work to reestablish a complete, modern nuclear fuel cycle for tritium production.  There are several milestones on the critical path that would adversely impact tritium production if they are not met on schedule:

  • Higher tritium production goals for the TVA reactors: deliver  2,800 grams of tritium per two 18-month reactor cycles of production in TVA reactors by 2027
  • New Lithium Facility at Y-12 operational by 2030
  • New uranium enrichment facility operational, perhaps by the mid-2030s

There is a general lack of redundancy in the existing and planned future nuclear fuel cycle for tritium production.  This makes tritium production vulnerable to a major outage at a single non-redundant facility. 

You can download a pdf copy of this post here: https://lynceans.org/wp-content/uploads/2020/05/US-tritium-production-for-the-nuclear-weapons-stockpile-–-not-like-the-old-days.pdf

7.  Sources for additional information:

For general information:

For more information on Cold War-era Hanford tritium production:

For more information on Cold War-era SRP / SRS:

For more information on Cold War-era lithium enrichment at Oak Ridge Y-12:

For more information on the front-end of the US nuclear fuel cycle (uranium mining, milling, conversion & enrichment):

60th Anniversary of the First Visit by Humans to the Deepest Point in the Ocean – the Challenger Deep

Peter Lobner

The Challenger Deep, in the Mariana Trench in the middle of western Pacific Ocean, is the deepest known area in the world’s oceans.  Its location, as shown in the following map, is 322 km (200 miles) southwest of Guam and 200 km (124 miles) off the coast of the Mariana Islands.

Location of the Mariana Trench.  Source:  Google Earth

Since the first visit to the bottom of the Challenger Deep 60 years ago, on 23 January 1960, there have been only five other visits to that very remote and inhospitable location.  In this post, we’ll take a look at the deep-submergence vehicles (DSVs) and the people who made these visits.

The following topographical map, created in 2019 by the Five Deeps Expedition, shows that the Challenger Deep is comprised of  three deeper “pools.”  The dive locations of the manned expeditions into the Challenger Deep are shown on this map.

  • 1960: Navy Lieutenant Don Walsh and Swiss engineer Jacques Piccard, in the bathyscaphe Trieste, made the first manned descent into the Challenger Deep and reached the bottom at 10,916 meters (35,814 ft) in the “Western Pool.”
  • 2012:  Canadian filmmaker and National Geographic Explorer-in-Residence James Cameron, in the DSV Deepsea Challenger, reached the bottom at 10,908 meters (35,787 ft) the “Eastern Pool.”
  • 2019:  Businessman, explorer and retired naval officer Victor Vescovo, in the DSV Limiting Factor, made two dives in the “Eastern Pool” and reached a maximum depth of 10,925 meters (35,843 feet).
  • 2019: Triton Submarine president, Patrick Lahey, in the DSV Limiting Factor, made two dives to the bottom, one in the Eastern Pool and one in the Central Pool.
Topography of the Challenger Deep and locations of the deep dive sites.  
Source: Five Deeps Expedition

What is there to see on the way down to the bottom?

The oceans can be divided into vertical zones based on water depth.  This basic concept is shown in the following diagram.

Vertical zonation of the ocean.  Source: adapted from https://www.slideshare.net/mstrieb/zonation-in-the-ocean-powerpoint

The five vertical zones in the above diagram have the following general characteristics:

  • The Sunlight Zone:  This is the shallow (upper 150 meters), sunlit upper layer of the ocean, extending above the continental shelf.  Phytoplankton can photosynthesize in this zone.
  • The Twilight Zone:  This is the medium-depth ocean where sunlight is still able to penetrate to a modest depth (a few hundred meters).  There is enough light to see, but not enough for photosynthesis.  This zone is bounded by the edges of the continental shelf and islands in the deep ocean.
  • The Midnight Zone:  This is the deep ocean, which is bounded by the continental slope and the seamounts and islands rising above the ocean floor.  No sunlight is able to reach this deep.  There is no photosynthesis in this zone.
  • The Abyssal Zone:  This zone includes the deep ocean plains and the deep cusp of the continental rise.  The temperature here is near freezing and very few animals can survive the extreme pressure.
  • The Hadal Zone:  This is the ocean realm in the deep ocean trenches.  More people have been to the Moon than to the Hadal Zone.

The Challenger Deep is the deepest known Hadal Zone on our planet.  On the way down through 11 kilometers (6.8 miles) of ocean, the few explorers who have reached the bottom have seen aquatic life throughout the water column and on the sea floor.  You can take a look the varied and strange sea life by scrolling through the well done graphic,  “The Deep Sea,” by Neal Agarwal, which is at the following link.

https://neal.fun/deep-sea/?fbclid=IwAR3_Z3Vzwoy_g9jWvbExxJfMb39KdhXlx7RSAE43Cc4ldplvx6kR8NPqVe8

Thanks to Mike Spaeth for sending me this link.

Now, let’s take a look at the few manned missions that have reached the bottom of the Challenger Deep.

1960:  Jacques Piccard and Don Walsh in the bathyscaphe Trieste

Trieste was designed by Swiss scientist Auguste Piccard and was built in Italy.  This deep-diving research bathyscaphe enabled the operators to make a free dive into the ocean, without support by cables from the surface.  Trieste was launched in August 1953, operated initially by the French Navy and acquired by the U.S. Navy in 1958.

The design of the 15 meter (50 ft) bathyscaphe Trieste is analogous to a zeppelin that has been redesigned to operate underwater.  On Trieste, the “gondola” is a 14-ton spherical steel pressure vessel for two crew members.  The weight of this “gondola” is carried under a large, lightweight, cylindrical float chamber filled with gasoline for buoyancy (gasoline is less dense than water).  There is no differential pressure between the float chamber and the open ocean.

General arrangement of the bathyscaphe Trieste.  Source: National Geographic

The Trieste is positively buoyant when loaded with ballast and floating on the surface before a mission.  To submerge, Trieste would take on seawater and fill its fore and aft water ballast tanks.  If needed to achieve the desired negative buoyancy, Trieste also could release some gasoline from the main float chamber.  To achieve positive buoyancy at the end of a mission and ascend back to the surface, the pellets in the two ballast hoppers would be released, and Trieste would slowly rise to the surface.

The propulsion system consists of five special General Electric 3-hp dc motors. These motors are designed to operate in inert fluid (silicone oil) and are subjected to full ambient pressure during diving operations.  These modest propulsors gave Trieste only limited mobility.

After acquisition by the Navy, Trieste was transported to San Diego, CA, for extensive modifications by the Naval Electronics Laboratory.  

After a series of local dives in Southern California waters, Trieste departed San Diego on 5 October 1959 aboard a freighter and was transported to Guam to conduct deep dives in the Pacific Ocean under Project Nekton. After arriving in Guam, record-setting dives to 18,000 and 24,000 feet were conducted in nearby waters by Navy Lieutenant Don Walsh and Swiss engineer Jacques Piccard (son of Auguste Piccard). Then Trieste was towed to the Mariana Trench dive site, where Walsh and Piccard began their mission into the Challenger Deep on 23 January 1960.

Trieste just before the record dive on 23 January 1960. The destroyer escort USS Lewis is in the background.  Source:  U.S. Navy photo.
Don Walsh (L) and Jacques Piccard (R) aboard Trieste.
Source:  U.S. Navy photo.

The mission took 8 hours and 22 minutes on the following timeline:

  • Descent to the ocean floor took 4 hours 47 minutes.  They reached the bottom at a depth of 10,916 meters (35,814 ft).
  • Time on the bottom was 20 minutes.
  • Ascent took 3 hours and 15 minutes.

For much of the mission, cabin temperature was about 7° C (45° F).  While on the bottom, Walsh and Piccard observed sea life, although the species observed are uncertain.  They described the sea bottom as a “diatomaceous ooze.”

Artist’s concept drawing of Trieste on the bottom.  Source: Internet Archive, page 21 of the book “The bathyscaph Trieste : technological and operational aspects, 1958-1961,” (1962) by Don Walsh

For a comprehensive review of this historic dive into the Challenger Deep, I recommend that you watch the following video, “Rolex presents: The Trieste’s Deepest Dive,” (22:38).

After successfully completing Project NektonTrieste underwent further modifications and was transferred to the East Coast in 1963 to assist in the search for the USS Thresher (SSN-593), which sank off the coast of New England.  Trieste found the wreck of the nuclear submarine at a depth of  2,600 m (8,400 ft).  Trieste was decommissioned in 1966 and went on display in 1980 at the National Museum of the U.S. Navy in Washington, D.C.  Following are photos I took during my visit to that museum.

Trieste bow quarter view, at the National Museum of the U.S. Navy.  P. Lobner photo
Trieste stern quarter view.  P. Lobner photo
Trieste crew pressure vessel.  P. Lobner photo.

2012:  James Cameron in the Deepsea Challenger

Almost a decade ago, filmmaker and National Geographic Explorer-in-Residence James Cameron led a team that designed and built the one-man, 11.8-ton DSV named Deepsea Challenger (DCV 1) for a mission to dive into the Challenger Deep and reach the deepest point in the ocean.  The general arrangement of this novel submersible is shown in the following diagram.

General arrangement of the Deepsea Challenger.
Sources: https://www.core77.com (left), Wikipedia (right)

In the water, the submersible floats vertically with the steel pilot’s chamber at the bottom of the vessel. When brought aboard its support vessel, the submersible sits horizontally in a cradle.

About 70% of the Deepsea Challenger’s volume is comprised of a specialized structural syntactic foam called Isofloat, which is composed of very small hollow glass spheres suspended in an epoxy resin. 

Syntactic foam, shown by scanning electron microscopy, consisting of glass microspheres within a matrix of epoxy resin.  Source:  Nikgupt via Wikipedia

The strength of this structural foam enabled the designers to incorporate 12 thrusters as part of the infrastructure mounted within the foam, but without the need for a steel skeleton to handle the loads from the various mechanisms. The lithium batteries are housed within the syntactic foam structure.  The foam also provides buoyancy, like the gasoline-filled float chamber on the bathyscaphe Trieste.

The Deepsea Challenger is equipped with a sediment sampler, a robotic claw, temperature, salinity, and pressure gauges, multiple 3-D cameras and an 8-foot (2.5-meter) tower of LED lights.  An underwater acoustic communication system provides the communications link with the support vessel during the dive.  Mission endurance is 56 hours.  

Deepsea Challenger floating vertically in the water with booms extended. Source: National Geographic

On March 26, 2012, more than 52 years after the Trieste’s dive into the Challenger Deep, Cameron plunged 10,908 meters (35,787 feet, 11 kilometers, 6.8 miles) below the ocean surface and became the first solo diver to reach such depths.  After a two hour and 36 minute descent, he traveled along the bottom for about three hours and reported it being a flat plain with a soft, gelatinous sea floor.  The thrusters enabled precise station keeping and a maximum speed of 3 knots. 

Artist’s concept drawing of Deepsea Challenger on the bottom.
Source:  http://divemagazine.co.uk
Deepsea Challenger being lifted aboard its support vessel, the Mermaid Sapphire,
 after returning from the Challenger Deep.  Source:  National Geographic
James Cameron emerges from Deepsea Challenger after returning from the 
Challenger Deep.  Source:  National Geographic

You can read a short summary of the mission here: https://www.nationalgeographic.com/news/2012/3/120326-james-cameron-mariana-trench-challenger-deepest-lunar-sub-science/#close

A National Geographic film of his expedition, Deepsea Challenge 3D, was released to cinemas in 2012.  You can watch the short movie trailer (2:44) here:

Cameron was awarded the 2013 Nierenberg Prize for Science in the Public Interest for his deep dive into the Challenger Deep.  In the following long video (58:25) “Journey to the Deep,” he shares his experiences and perspectives from his record-setting dive. 

The Deepsea Challenger is retired from diving.

2019:  Victor Vescovo and the Five Deeps Expedition

In 2015, businessman and explorer Victor Vescovo partnered with Triton Submarines LLC to design and build the two-person, 14-ton, titanium hull, deep-submergence vehicle Limiting Factor to enable Vescovo to conduct the Five Deeps Expedition to visit the deepest points in the world’s five oceans.  The Five Deeps Expedition website is here: 

https://fivedeeps.com/home/expedition/

Between December 2018 and August 2019, the Five Deeps Expedition team accomplished this goal:

  • Atlantic Ocean’s Puerto Rico Trench:  December 2018; depth 8,375 meters (27,477 ft).
  • Southern Ocean’s South Sandwich Trench:  February 2019; depth 7,434 meters (24,388 ft).
  • Pacific Ocean’s Mariana Trench / Challenger Deep: May 2019; depth 10,925 meters ±  6.5 meters (35,843 ft ±  21 ft).
  • Indian Ocean’s Java Trench:  April 2019; depth 7,192 meters (23,596 ft).
  • Arctic Ocean’s Molloy Deep: 24 August 2019; depth 5,550 meters (18,209 ft).

During this period, the expedition covered 87,000 km (47,000 nautical miles) in 10 months and the Limiting Factor submersible completed 39 dives.

Locations of the Five Deeps diving sites.  Source:  https://tritonsubs.com/hadal/
Victor Vescovo in full dive gear during his 2019 dives to the bottom of the Mariana Trench’s Challenger Deep. Source: Glenn Singleman photo via Wikipedia

The DSV Limiting Factor is a Triton 36000/2 submersible that is designed for dives to 11,000 m / 36,000 ft and pressure tested to 14,000 m / 45,991 ft.  Like James Cameron’s Deepsea Challenger, the Limiting Factor is constructed with glass-bead based syntactic foam, which is very durable and able to withstand the enormous pressure placed on the submersible as it descends thousands of meters into the sea, and does so repeatedly without significant deformation or stress fractures developing over time.

The Limiting Factor has a Kraft Telerobotics “Raptor” hydraulic manipulator capable of functioning at full-ocean depth.  Mission endurance is 16 hours plus 96 hours of emergency life support.  

Triton 36000/2 exterior view.  Access hatch is at the top center.  Thrusters are located on the sides.  View ports for the two-person crew are at the bottom center.  Source:  Five Deeps Expedition
Triton 36000/2 interior view. The spherical titanium pressure vessel for the two-person crew sphere in the center, beneath the access trunk.  Thrusters and their support structures are mounted to the pressure vessel.  
Source:  Five Deeps Expedition

More details on the Triton 36000/2, also known as the Hadal Exploration System, are available here: https://fivedeeps.com/home/technology/sub/

Using a Kongsberg EM124 multi-beam echo sounder mounted to the hull of the support vessel DSSV Pressure Drop, the Five Deeps Expedition team created detailed topographical maps of the Challenger Deep before the first of four dives.  Dives 1 and 2 were conducted by Vescovo into the Eastern Pool.  Dives 3 and 4 were conducted by Triton Submarines President, Patrick Lahey; Dive 3 was into the Eastern Pool and Dive 4 was into the Central Pool.  Two days later, Dive 5 was conducted in the Sirena Deep.  These five dives were accomplished in eight days.  A synopsis of each dive follows:

  • Dive 1 (28 April 2019):  This was the deepest dive of the mission and the deepest dive in human history. Vescovo reached the bottom at a depth of 10,925 meters ±  6.5 m (35,843 ft ±  21 ft, 10.92 km, 6.79 miles).  Time on the bottom was 248 minutes.  Note that the maximum depth originally was reported as 10,928 meters ±  10.5 meters, but this was later corrected.  See the depth certification here:  https://fivedeeps.com/wp-content/uploads/2019/10/Triton-LF-Max-Depth-Confirmation-for-Dives-12-DNV-GL.pdf
  • Dive 2 (3 May 2019):  Vescovo reached a depth of 10,927 meters.  Time on the bottom was 217 minutes. 
  • Dive 3 (3 May 2019):  This was a commercial certification dive with Patrick Lahey piloting and Jonathan Struwe aboard as a specialist.  A Five Deeps Expedition scientific lander that became stuck on bottom during Dive 2 was freed from the bottom and recovered from 10,927 meters by direct action of the manned submersible (deepest salvage operation ever). Time on the bottom was 163 minutes.  The submarine passed all of its qualification tests and commercial certification by DNV GL was granted following this dive.
  • Dive 4 (5 May 1959):  This was a scientific dive with Patrick Lahey piloting and John Ramsay (the submarine’s designer) in the second seat.  Video surveys were conducted and biological samples were collected.  Time on the bottom was 184 minutes.
  • Dive 5 (7 May 2019): While still in the Mariana Trench area, Lahey conducted the first ever dive into the Sirena Deep, 128 miles (206 km) northeast of the Challenger Deep.  On this dive (Dive 5), he reached a depth of 10,714 meters (35,151 ft, 6.66 miles).  Time on the bottom was 176 minutes.
DSV Limiting Factor preparing to dive into the Challenger Deep
Source:  Triton Submarines LLC
DSV Limiting Factor being recovered by its support ship DSSV Pressure Drop.
Source: Five Deeps Expedition

You’ll find a good summary of the five dives in the Challenger Deep and Sirena Deep in the expedition’s press release dated 13 May 2019, “Deepest Submarine Dive in History, Five Deeps Expedition Conquers Challenger Deep,” which is available here:

https://fivedeeps.com/wp-content/uploads/2019/05/FDE-Challenger-Release-FINAL-5132019.pdf

The Five Deeps Expedition’s “Pacific Ocean Expedition Blog,” also provides an excellent overview of this mission at the following link:

https://fivedeeps.com/home/expedition/pacific/live/

The entire expedition was filmed by Atlantic Productions for a five-part Discovery Channel documentary series, “Deep Planet.”

Into the future

The Triton 36000/2  Limiting Factor is the only submersible that is commercially certified for repeated exploration to the deepest points in the ocean. It is the only insurable, full ocean depth (FOD) manned submersible in the world. The official certification of the vessel to FOD is overseen by an independent third party, the world-standard credentialer of maritime vessels DNV-GL (Det Norske Veritas Germanischer Lloyd). 

The manufacturer, Triton Submarines LLC, located in Vero Beach, Florida reported:

  • “Designed and certified to make thousands of dives to Hadal depths, during decades of service, Triton is excited to offer the opportunity for a private individual, government or philanthropic organization or research institute to acquire this remarkable System and continue the adventure.”
  • “Available to purchase today for $48.7 million, the Triton 36,000/2 Hadal Exploration System will be ready for delivery in 2019, after its successful (Five Deeps) expedition. The System will be fully proven. It will have extended the boundaries of human endeavor and technology. And it will offer a unique deep-diving capability unmatched by any nation or organization in the world.”

The Triton website is here:  https://tritonsubs.com

They’re waiting to take your order.